Photovoltaic system sizing report

Angel-Global Partner.com
Adresse:
Fatih cad.14 Sok 11/f Oba mah.
Antalya/alanya
Photovoltaic system
sizing report
1012 KWp Kurulum Genel Gorunumu
Project :
Antalya 1 MWp Arazi Ustu
Client :
Zeki Kücükyarma Stephan Rindisbacher
Address :
Phone number :
E-Mail :
Fatih cad . 14 sok 11/f Oba mah.
07400 Antlaya/ Alanya
+90 501 211 74 05
+90 543 960 3146 +41445860562
info@angel-globalpartner.com
riba58@sunrise.ch
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
Panel Sehpasi Ve Tel Cit Uygulama Gorunumleri
DC : 1012 KWp
AC : 990 KW Toplam Guc
Sebekeye Verilen Maksimum Guc 990 AC Output
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
. Hypothesis:
Climate reference :
Station name
Latitude (°)
Longitude (°)
Altitude (m)
Mean albedo
- first quarter
- second quarter
- third quarter
- fourth quarter
Annual Data
Direct irradiation (kWh/m2)
Diffuse irradiation (kWh/m2)
Global irradiation (kWh/m2)
Antalya
36.86
30.73
50
0.20
0.20
0.20
0.20
1107.00
651.00
1758.00
Origin of meteorological data :
Données MeteoNorm issues des bases de données Cythelia, Ta 1996-2005, Ins. 1983-1992
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
Site information :
Site name
Latitude (°)
Longitude (°)
Altitude (m)
Annual solar irradiation
Horizontal without mask (kWh/m²/yr)
Horizontal with mask (kWh/m²/yr)
Shadow Factor
36.86
30.73
50
1758
1752
1.00
Horizontal month solar irradiation (kWh/m2):
Direct
150
141
141
Diffuse
124
125
121
118
102
100
89
75
75
50
54
49
75
73
68
80
71
53
50
46
50
39
38
33
31
31
25
0
Shading :
90°
85°
80°
75°
70°
65°
60°
55°
50°
45°
40°
35°
30°
25°
20°
15°
10°
5°
0°
July
Aug ust
September
October
Nov ember
Dec ember
June
May
March
Febr uary
January
-180°
-150°
-120°
-90°
-60°
-30°
0°
30°
60°
90°
120°
150°
180°
Diffuse model choice : Hay and Davies
(Shadowing Factor = Solar Irradiation annual with mask / Solar Irradiation annual without mask)
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
. Results:
Production results :
Total module count
Peak power (kWp)
Year DC production (kWh)
Year AC production (kWh)
Year needs (kWh)
DC specific production (kWh/kWp)
AC specific production (kWh/kWp)
Mean* performance ratio (%)
Initial performance ratio** (%)
4048
1 012.0
1 503 921
1 405 338
0
1 486
1 389
79.26
82.88
Monthly production and consumption (kWh AC) :
175 000
167 523
168 245
159 283
150 282
150 000
138 743
132 393
125 000
118 070
101 591
100 000
77 656
75 000
68 026
66 545
56 983
50 000
25 000
0
Production (kWh/month)
*Mean value of performance ratio during observation period
**Mean value of initial performance ratio (year 0)
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
Detailed results :
Annual AC productions (kWh):
1 500 000
1 250 000
1 000 000
750 000
500 000
250 000
0
AC price (€/kWh) :
0.1000
0.0750
0.0500
0.0250
0.000
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
Annual incomes (€):
175 000
150 000
125 000
100 000
75 000
50 000
25 000
0
Return on investment time:
1 750 000
1 500 000
1 250 000
1 000 000
750 000
500 000
250 000
0
-250 000
-500 000
-750 000
-1 000 000
-1 250 000
-1 500 000
-1 750 000
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
Glossary :
Peak Power:
Power (in Wp) provided by modules in watts at STC
(standard test conditions : 1 000 W/m², AM 1.5 spectrum, 25°C cell temperature)
Yield:
Energy produced by the photovoltaic installation, in kWh
AC:
Alternative Current
DC:
Direct Current
Specific Yield:
Productible normalized to installed power, in kWh/kWp
Performance Ratio:
ratio beetween specific yield and annual incident irradiation, expanded in % (kWh / kWp x h)
Return on investment time:
ratio beetween annual cash-flow and investment (expanded in years)
NPV rate:
rate representing the cost of access to capital
NPV, Net Present Value:
Generated Value at the end of observation period
Actual return on investement time:
Observation time zeroing the net present value
Internal Rate of Return:
NPV-rate nullifying the net present value
Profitability Index:
ratio beetween net present present value and investment
BOS, Balance Of System:
Cost including all components of a photovoltaic system, except modules
LCOE, Levelized Cost Of Energy (or Overall discounted cost) :
It is the ratio between the discounted cost of the project and the total
energy produced over the observation period.
This is the cost per kWh produced by the installation (€/kWh).
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
Technical description:
Description of PV field
1 : PHOTOVOLTAIC FIELD 1
Field name
PHOTOVOLTAIC FIELD 1
Modules
- Manufacturer
- Model
- Technology
- STC power (Wp)
- Vpmax (V)
- Isc (A)
- STC efficiency (%)
- Modus count
- String modules
- Modules branches
- Installed power (kWp)
- Surface (m²)
- Surfacic mass (kg/m²)
- Total mass (kg)
Yingli Solar
Yingli Solar - YL250P-29b
multicrystalline (mc-Si)
250.0
29.8
8.92
15.3
2024
23
88
506.00
3 306.2
0.0
0.0
Inverter
- Manufacturer
- Model
- Nominal power (W)
- Max input voltage (V)
- Inverters count
- Total power (kW)
- Maximum efficiency (%)
- European efficiency (%)
GH
Huawei 20000
20 000
1 000
22
440.0
98.6
98.3
Geometry
Tracking type :
Orientation (°):
Slope (°):
Steady
0
25
Field degradation assumptions :
Mismatch (%) : 1.00
Modules aging (%/year) : 0.43
Module back ventilation: 0.00 (back space < 2.5 cm)
Angel-globalpartner.com
Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf