SHINKAWA JAPAN Description of building - Commissioning

DEMONSTRATION SITE: SHINKAWA JAPAN
Description of building: Shinkawa building
) Location: TOKYO – JAPAN
) Type of building: Office building
) Year of construction:1988 Winter
-Renewal :2003
) Size: 5400 m2 (Heating & Cooling conditioned
floor)
) Contacts:
•
K,KAMITANI kkamitani@tonets.co.jp
Description of HVAC system
冷房:氷蓄熱槽
暖房:温水槽
T
T 温度センサ
BH P- 1
F
W
W
W
T
T
W
B HP -2
H T
T
A HU
×8フロア
W
W
FC U
F
BP -1 , 2
C HP -1 , 2
W
H P- 1 ,2
T
T
T
T
Tonetsu shinkawa
Bild.
Moniter
(Guard room)
W
Tonetsu Group
Controll Center
Door
Crime
prevention
system
Door
W 電力量計
W
T
F
T
F 流量計
158kW×2台
T
Plant level
• 1 Air-Source Brine Heat Pump(158kW×2)
• 2 Ice Thermal Storage Tank(64m3×2,IPF=8%)
(Also used heating water in winter.)
• 3 AHU/CAV on each floor
FCU for perimeter zone.
• 4 VWV system W/2-way control valves.
Zone level
• AHU & Fan Coil Unit
Network controller
A central supervisory
system
Communication
cable
ADSL
modem
Network controller
Network
controller
for AC
Network
Network controller
controller
for AC
A central supervisory
system
VPN
router
VPN
router
Internet
ADSL
modem
BEMS system
• Brand: Original(EASY Net-1000)
• Size: 800 points
• Local controller: Original(EASY Net-10)
• Supervisor: Design Insight
An emergency
board
Commissioning project
Objectives:
Renewal of BAS/BEMS and automatic controls
• Evalution and practice of commissioning
• Energy saving
• BEMS assisted tools
Type of Commissioning:
• Re Commissioning
Phases concerned:
• All phase
Target users:
• Building owners
Tools and methods tested
Manual tools
Commissioning process controls by MQC and
check lists
1. Equipment ledger
2. Graphical analisys (Trend Graphic)
3. Conpare Resalts data with deal value
GJ/日
データの期間 1989年04月01日~1990年03月31日 データ数 365件
30
夜間移行率 81% 93%
25
設計最大負荷 20.6GJ/日
20
昼
206
昼
71
夜
872
夜
1010
昼
15
最大
10
夜
5
夜間電力蓄熱量 9.2GJ/日
0
0
50
100
150
200
250
300
350
BEMS assisted
Automatic Cx Tools
NEDO year end report
%
The first year (In January - March)
March)
1. Primary energy Consumption analisys
About 10%
100
Borderline
9.5%
Average
20
(The past data)
Before
40
35
30
25
20
15
10
2500
(Numerical
value in the
application)
Result
外気温
After
1995
2000
1748
Primary energy consumption quantity actual results value comparison
1508
1500
1454
1423
1405
90
91
92
1200
1419
1742
120%
100%
80%
60%
40%
20%
0%
2. The comfortableness evaluation of the indoor
environment
入居率
40
一次エネルギー消費量[MJ/㎡・年]
60
平均外気温度[℃]
80
入居率
1914
1865
1474
1334
1000
500
0
88
89
熱源機器
空気搬送系
系列7
93
94
年度
水搬送一次系
照明コンセント
95
96
97
98
99
00
水搬送二次系
その他
Practical experiences
Users interview
Occupant Interview
Operator Interview
There is a cold place by the place with the hot •
place 【 indoor temperature 】.
•
•
The control of indoor temperature is difficult.
(There are many partitions between the insides.)
Some technical equipments are not accessible
Cx actions
・The optimisation of the operation of the heat source system
・Control of saving energy of the building
・Installation review and verification of the sensors and actuators
Cx Recommendations
1 Design Review
Collation confirmation with the design specification of the selection machine
2
Installation Review and
Verification
While a tenant continued business activities, the verification of the process control
and the control of execution was done to the condition that construction was carried
out.
3
Installation Review and
Verification with BEMS
The test verification of control logic
4
Measurement
Verification with BEMS
・Relative comparison with the standard thermometer of the temperature sensor
・The performance verification of the machine ability
5
Forced Response
Testing and Analysis
An unusual value detection test
6 Documentation
Design Drawing、Manufacture Specifications