Hydrotesting & Pigging Requirements - Customer Inquiry Form Date: Company: Name: Address: Tel: Mobile: Fax: Email: Mobilization / Demobilization Mobilization Date: Demobilization Date: Mobilization Location: Project POC: POC Phone Number: Pipeline Details Type of Pipeline (NGL, Oil, etc.): Pipeline location (Land or Offshore): Pipeline Length: Pipeline OD & Wall Thickness: ANSI/ASME: Pipeline Min/Max Elevation Changes: Maximum Water Depth: Riser Water Depth: Pipeline MAOP: Please send completed form to Ryan W. Smith or to Anthony Hall Email: rsmith@globalnitrogenservices.com Email: ahall@globalnitrogenservices.com Fax: 713-937-5236 Scope of Work (Check One) Pre- Cleaning: Yes No Filling: Provide Pig Speed: Inhibitor, O2 Scavenger, Biocide: Provide Type and PPM: Hydrostatic Testing: Minimum Test Pressure: Maximum Test Pressure: Dewatering: Drying: Provide Dew Point: Cleaning: Provide Penetration: Caliper Inspection: Provide Pig Speed: MFL Inspection: Provide Pig Speed: Nitrogen Packing: Provide Pack Pressure: Launcher/Receiver Provided: Other Information: Please send completed form to Ryan W. Smith or to Anthony Hall Email: rsmith@globalnitrogenservices.com Email: ahall@globalnitrogenservices.com Fax: 713-937-5236
© Copyright 2024 Paperzz