<Project Name> Activity and Job number <Date> <Revision> Template Status Discipline: Engineering Category: Procedure - Template Related Procedure: EGP-20-01 Project Management Template number: EGW2002T-03 Simple Project Work Package Date Reviewed: 08 Jul 2015 Version: 1.2 © Australian Rail Track Corporation Limited (ARTC) Disclaimer This document has been prepared by ARTC for internal use and may not be relied on by any other party without ARTC’s prior written consent. Use of this document shall be subject to the terms of the relevant contract with ARTC. ARTC and its employees shall have no liability to unauthorised users of the information for any loss, damage, cost or expense incurred or arising by reason of an unauthorised user using or relying upon the information in this document, whether caused by error, negligence, omission or misrepresentation in this document. This document is uncontrolled when printed. Authorised users of this document should visit ARTC’s intranet or extranet (www.artc.com.au) to access the latest version of this document. CONFIDENTIAL Activity and Job number <Date> <Revision> <Project Name> Contents 1 2 Work Package Details ............................................................................................................. 4 1.1 Description of Work ........................................................................................................ 4 1.2 Site Specific and Activity Risks ....................................................................................... 5 1.3 Resources ....................................................................................................................... 5 1.4 Permits ............................................................................................................................ 5 Site Details ............................................................................................................................... 6 2.1 Access / Egress .............................................................................................................. 6 2.2 Site Layout ...................................................................................................................... 6 2.3 Possession Details ......................................................................................................... 6 2.4 On-Track Plant and Machinery Movements ................................................................... 6 2.5 Communication and Contact Details .............................................................................. 6 2.6 Emergency Arrangements .............................................................................................. 7 2.6.1 3 2.7 Welfare............................................................................................................................ 7 2.8 Interfaces ........................................................................................................................ 7 Briefing ..................................................................................................................................... 8 3.1 4 6 Briefing Arrangements .................................................................................................... 8 Configuration Management ................................................................................................... 8 4.1 5 EMERGENCY CONTACT NUMBERS .............................................................. 7 Network Alteration Notice ............................................................................................... 8 Appendices .............................................................................................................................. 9 5.1 Rail Safety Worker Card Check ...................................................................................... 9 5.2 Specifications .................................................................................................................. 9 5.3 Approvals ........................................................................................................................ 9 5.4 Safe Work Method Statement......................................................................................... 9 5.5 Drawings ......................................................................................................................... 9 5.6 Detailed Costing ............................................................................................................. 9 5.7 TBEIA (If Applicable) ...................................................................................................... 9 Close Out ...............................................................................................................................10 6.1 Work Acceptance ..........................................................................................................10 6.2 Project Objectives .........................................................................................................11 6.3 Outstanding Works and Actions ...................................................................................13 6.5 Lessons Learnt .............................................................................................................13 6.6 Recommendations ........................................................................................................13 6.7 Supporting Documentation ...........................................................................................13 Engineering Procedure - Template Page 2 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> Document Control Date Issued: Revision: 1 Category Name & Title Signature Date Prepared by: Accepted by: Endorsed by: Endorsed by: Endorsed by: Endorsed by: Approved By: Template Revision Control: Revision Date Issued 1.0 03 Sep 13 1.1 04 Dec 14 To Description Initial issue various Minor editorial changes Engineering Procedure - Template Page 3 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 1 Work Package Details 1.1 Description of Work Purpose of works Job number and activity Overview Location Proposed start date Component Estimate Internal Labour External Labour Internal Plant Cost Estimate and Summary: Financial External Plant Materials Subcontract services TOTAL ESTIMATE BREAKDOWN Scope Unit Rate Programme Method of authorising start of work and procedure on completion of works Temporary Works Lifting Plans and details of exclusion zones around plant and equipment Exclusion zone of 20m applies if not directly involved with operation of equipment or the direction of works. Quality Requirements / Relevant ITP’s Impact on Operations Methodology Engineering Procedure - Template Page 4 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 1.2 Site Specific and Activity Risks Note: High Level Risks associated with delivery of the Annual Works Plan are included in the Program Management Plan. Full WHS risk assessments and the relevant controls are detailed in the SWMS Hazard 1.3 Control Tasks where hazard needs to be briefed Resources Labour/Plant /Tools / Machines /Materials PPE Mandatory PPE on ARTC sites consists of hi visibility vest or jacket and steel toe capped boots. Shift 1.4 Permits Permits Engineering Procedure - Template Page 5 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 2 Site Details 2.1 Access / Egress Access / Egress 2.2 Site Layout Limits of the Work Package Plan Track layout, line speed Dial Before You Dig Location of Environmental Sensitive Sites Worksite Protection Plan 2.3 Possession Details TAA Numbers Train Alterations Safe Working Rules NCOP VIC TA20 Planned Usage Safe Working Description NCOP VIC TA20 TAA – No Train Period Local Possession Absolute Occupation TAA – ATP TOA Track Warrant Daily ATP TRI Under Own Protection Work Authority Train Authority Look out working (NSW) Look out working 2.4 NSW Comments On-Track Plant and Machinery Movements To be advised by Contractor 2.5 Communication and Contact Details Role Name Contact number Project Manager Project Supervisor Contractor’s Site Supervisor Engineering Procedure - Template Page 6 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 2.6 2.6.1 Emergency Arrangements Contact network control and emergency services Get clear of track if safe to do so. The safe place will be identified each day as part of the prework brief. EMERGENCY CONTACT NUMBERS POLICE FIRE AMBULANCE 000 Network Control OTHER EMERGENCY NUMBERS Environment Agency Water Telecoms Nearest Emergency Departments are: Other: Hospital Details, Directions/Map 2.7 Welfare Site Facilities required 2.8 Interfaces Adjacent Networks/ Operators Public and Stations including Level Crossings and Highways Environment – Vegetation, excavated spoil, noise, dust etc. Waste Statutory and Enforcement Authorities Engineering Procedure - Template Page 7 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 3 Briefing 3.1 Briefing Arrangements All workers and visitors to site will be required to read a SWMS specific to the activity and location. A pre-work brief will be held to cover any daily or worksite specific risks 4 Configuration Management 4.1 Network Alteration Notice Engineering Procedure - Template Page 8 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 5 Appendices 5.1 Rail Safety Worker Card Check 5.2 Specifications Note: Standards are not attached here but are accessible through the ARTC external website (www.artc.com.au) or ARTC intranet 5.3 Approvals 5.4 Safe Work Method Statement 5.5 Drawings 5.6 Detailed Costing 5.7 TBEIA (If Applicable) Engineering Procedure - Template Page 9 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 6 6.1 Close Out Work Acceptance May include: Configuration Management Team Manager Handover Contracted Works Complete the EGW2001T-18 Certificate of Practical Completion and Handover, Engineering Procedure - Template Page 10 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 6.2 Project Objectives Scope, Time, and Cost Performance Summary Planned Detailed Planned vs. Detailed Explained Actual Delivered Detailed vs. Actual Explained Scope Cost Unit rate Time May include: Scope Performance Changes to materials/quantities/location and reason why May include: Time Performance Production rates Track windows Planned Actual Difference Internal Labour External Labour Internal Plant Cost Performance External Plant Materials Subcontract services TOTAL ESTIMATE BREAKDOWN Discuss reasons for any major variances Engineering Procedure - Template EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. Page 11 of 13 EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> May include: Quality Performance Safety Performance Defects removed New defects in the system Information about what quality processes and documentation were used May include LTIs, MTIs, near misses, innovative safety measures adopted Reference any variations submitted for this project Engineering Procedure - Template EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. Page 12 of 13 EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2 Activity and Job number <Date> <Revision> <Project Name> 6.3 Outstanding Works and Actions Outstanding Action/Works Responsible Person Target Delivery Date May include: 6.5 NAN close out Installation of associated equipment (eg lubricators at re-rail sites) Defect closeouts (eg weld testing, re-grinding) Lessons Learnt Topic Lessons Learnt Description Method of Learning Responsibility Possible topics may include: 6.6 Planning Resourcing Contractor management Delivery strategy Provide Lessons Learnt for upload to the ARTC Project Management SharePoint Site Recommendations Recommendation Delivery/Planning Impact and Actions Responsibility May include: 6.7 Unit rates altered in future years planning Changes or improvements to planning info collected and provided Detailed scoping Stakeholder consultation Delivery method and associated planning and resourcing Acceptance of close out report Supporting Documentation May include: Works as executed NAN Site diaries QA documents (ITPs, weld forms) Engineering Procedure - Template Page 13 of 13 EGP-20-01 Project Management This document is uncontrolled when printed. See ARTC Intranet for latest version. EGW2002T-03 Simple Project Work Package Date of last revision: 08 Jul 2015 Version 1.2
© Copyright 2025 Paperzz