MANAGEMENT INFORMATION SYSTEM GOALS AND OBJECTIVES SPFY 2018 GOAL 1: To implement the MIS and EBT Projects before 2020. OBJECTIVE !: To start the Implementation Plan of MIS and EBT with the contractors. SPECIFIC ACTIVITY OR TASK RESPONSIBLE STAFF STARTING-ENDING DATE MONTH/YEAR a. Commence meetings Contractors/WIC Project 10/10/2017 –10/16/2017 MIS Contractors/WIC Project Team 10/16/2017 - 12/15/2017 with bid winner for the Team MIS and EBT implementation. b. Conduct the GAP analysis. c. Update the inventory WIC Project Team 10/11/2017 – 12/15/2017 of IT equipment to replace it, where needed. d. Implement MIS and Contractors/WIC Project 1/3/2018 – 9/17/2019 EBT. e. Conduct mini pilot. 7/5/2018- 9/28/2018 Team Contractors/WIC Project Team Management Information System -Goals and Objectives SPFY2018 Draft 1 COMMENTS f. Conduct integrated pilot. an Contractors/WIC Project Team / finalize Contractors/WIC Project Team Security Plan. g. Update 10/1/2018- 3/12/2019 5/2018 – 7/2018 OBJECTIVE 2: To merge EBT with the existing MIS. SPECIFIC ACTIVITY OR RESPONSIBLE STAFF TASK a. Conduct meetings, GMST/WIC Project Team outreach and provide orientation to vendors and vendors association on EBT. b. Perform the Analysis GMST/WIC Project Team STARTING-ENDING DATE MONTH/YEAR 10/2/2017 – 12/20/2017 1/13/2018 – 2/28/2018 and Design for the changes required to support the MIS transfer system. c. Conduct MIS Development and Contractors/WIC Project Testing for the Team changes required by PRWIC Program. Management Information System -Goals and Objectives SPFY2018 Draft 2/28/2018 – 5/8/2018 2 COMMENTS d. Conduct 1/13/2018 – 2/28/2018 e. Develop and Test of GMST/WIC Project Team 2/28/2018 - 5/8/2018 EBT GMST/WIC Project Team Analysis and Design for changes required in the EBT system. EBT to ensure proper performance. vendor GMST/WIC Project Team training on the EBT process. 7/5/2018 – 7/11/2018 g. Perform EBT/MIS Contractors/WIC Project Team Integrated Testing. 7/5/2018 – 9/28/2018 h. Enable vendor stores GMST/WIC Project Team 7/5/2018 – 10/24/2018 f. Provide to accept WIC EBT by either integrating WIC EBT into existing cash register systems or utilize State-owned stand-beside equipment. i. Perform an Integrated Contractors/WIC Project 7/5/2018 – 9/28/2018 Pilot in the selected Team clinics and vendors. the new Contractors/WIC Project Team system island wide. j. Rollout Management Information System -Goals and Objectives SPFY2018 Draft 3/12/2019 – 9/17/2019 3 GOAL 2: To ensure maximum system availability by implementing redundancy in existing single point of failure. OBJECTIVE: To verify that communication systems comply with program requirements for the rendering of clinic services. ACTIVITY OR SPECIFIC RESPONSIBLE STAFF TASK a. Acquire secondary WIC/OIAT/System communications Contractor service from clinics to primary and secondary sites. STARTING-ENDING DATE MONTH/YEAR October 2018 – on going b. Upgrade (or install, if WIC/OIAT/System different contractor), Contractor communications between primary and secondary sites. November 2017 c. Configure clinics for WIC/OIAT/System load sharing. Contractor August 2018 d. Upgrade storage for WIC/OIAT/System secondary sites. Contractor September 2018 e. Implement replication WIC/OIAT/System for the new system. Contractor June 2018 Management Information System -Goals and Objectives SPFY2018 Draft 4 COMMENTS Will have an alternate line that will be paid in an annual contract. Redundancy process.
© Copyright 2025 Paperzz