Winston-Salem State University Sciences Building Special Inspections and Materials Testing Request for Qualifications June 13, 2017 Project Description Winston Salem State University (WSSU) is seeking Special Inspections and Material Testing for the new “Sciences Building”. The total construction budget shall be $40,500,000 for construction of a 103,000 square foot five-story building. Project Scope Special inspections, and Material Testing will be in accordance with the requirements of the North Carolina State Building Code, the NC State Construction Office, and the Contract Documents for the project. GeoTechnical analysis, foundation, and structural design has previously been completed, and are not included in the scope. Project Site The site for this project is located on the WSSU campus on Cromartie Street and will be located immediately to the West of the W.B.Atkinson Science Building. Project Schedule Construction Documents are nearly complete. Notice to Proceed with Construction is tentatively estimated for the Fall, 2017. Design Process The selected firm will work through the Winston-Salem State University Department of Design and Construction. The design and construction is planned to include normal involvement of the State Construction Office. Critical Selection Factors Interested firms can participate in the process by submitting a current SF-330 form and addressing the following in a written proposal. Please note that three copies of the proposal are required and the length should be limited to 20 sheets of paper, double sided, (exclusive of the SF-330, and exclusive of the front and back cover). Firms are requested to assure receipt of proposals at the address listed at the end of this document by the date and time as shown on the UNC website, under “Designer Solicitations”, at the following URL address: http://www.northcarolina.edu/apps/finance/vendors/opportunities.htm Include, in your qualifications submission, information addressing the state required selection criteria listed below. Please replicate the numerical identification and order in your proposal to coordinate with the items as specified below: (1) (2) (3) (4) (5) (6) (7) (8) Specialized or appropriate expertise in the type of project. Past performance on similar projects. Adequate staff and proposed design or consultant team for the project. Current workload and State projects awarded. Proposed design approach for the project including design team and consultants. Recent experience with project costs and schedules. Construction administration capabilities. Proximity to and familiarity with the area where project is located. Page 1 of 2 Winston-Salem State University Sciences Building Special Inspections and Materials Testing Request for Qualifications June 13, 2017 (9) (10) (11) Record of successfully completed projects without major legal or technical problems. Experience with the CM at Risk delivery method. Other factors that may be appropriate for the project. (UNC uses these criteria and adds HUB participation on the design team/consultants as an additional factor). Designer Selection Process Following the receipt of proposals, members of the building committee will make a selection ranking order of the top three firms at which time negotiations will begin with the #1 ranked firm. Questions/Proposal Submittal In order that the selection process is as objective as possible, do not contact members of the Board of Trustees or any university officials other than the project manager. All questions and project submittals shall be directed to: Ronald Vanard, RA, NCARB University Architect, Project Manager Winston-Salem State University Design and Construction 1604-C Lowery Street Winston-Salem, NC 27110 Tel: (336) 750-2852 Page 2 of 2
© Copyright 2025 Paperzz