Drawings

Fl
oor
Vau
lt L
id
T
Elect.
A191
(e) Electric panel
FLOOR PLAN NOTES
1. Provide and install (2) 1 1/4” conduits to 6" above accessible ceiling
for data/comm wiring by others. Extend conduits under floor from east
to desk.
Dimensions:
A. All dimensions to face of finish unless otherwise noted.
B. Field verify all existing structure and conditions.
C. Field verify rough openings of door.
2. Saw-cut floor and run conduits under floor and extend as indicated.
At completion floor shall be repaired as appropriate for new finish.
3
1
Reception
A101
POWER & SPECIAL SYSTEMS KEYED NOTES
2
S
S
A
SAM STERLING ARCHITECTURE , llc
Lobby & Reception
FINISH & MATERIAL NOTES
3. Extend 4#12, 1#12g in .75” conduit to (2) 20a/1p spare circuit
breakers in existing electrical panel located in Rm A191.
Gyp Board:
A. Texture to match (e).
4. 20a, 120v duplex receptacle in single gang box, up 18” a.f.f.
(typical).
Paint:
A. All new paint to match (e). Verify w/Owner and Architect.
B. Paint all exposed conduit, data boxes and j-boxes to match
adjacent wall.
5. 4” Square box with single-gang mud-ring for recessed data/comm
outlets by others (typical).
T
Receptacles / Data Ports / Coverplates:
A. All new receptacles, data ports & coverplates to match
color & style of existing.
6. Disconnect and remove existing receptacles and
data/comm outlets completely along with condut and wiring.
924 2nd street nw suite c
albuquerque, new mexico 87102
o: 505 232-2520 f 505.232.2521
www.samsterlingarchitecture.com
Building A Key Plan
Not to Scale
(typ)
4
(typ)
5
6
MCO Reception Power & Special Systems Plan
3
Scale: 3/16" = 1'-0"
ADDITAVE ALTERNATE #1
Remove Roll-up window and
counter.
See Sheet A1.2
ADDITAVE ALTERNATE #1
New gyp. bd. wall to match
existing. Paint walls in lobby
A100.
See Sheet A1.2
Vestibule
A100B
8/A1.2
SF-3
BOLD DASHED LINE DENOTES
THE AREA OF WORK
3 '-
Office / Storage
A102
9"
1
A1.1
(e)
New recessed floor mat.
Enlarge existing recess to
accomodate new mat.
Remove ACT ceiling and grid
and light fixture
Vestibule
A100B
Remove metal hand rail
Ma
Remove ACT ceiling, grid & light
Lino
t
New floor mat
Li n
Remove floor mat
PROJECT
o
7/A1.2
Lino
Linoleum / Carpet
A100-A2
Finish Floor
+ 100'-0"
A100-A1
Lobby
A100
Vestibule
A100A
6'-8"
EQ
Remove mesh railing and door
pushbutton
Pattern
orientation
Carpet tile #1/ seating area
- Contractor to remove and
reset (e) furniture .
Coordinate furniture
schedule with owner.
Mechanically remove
(e) flooring & vinyl base
complete
18'-4"
SHEET INFO
A1.0
T
Patch and Paint walls
Elect.
A191
Remove door, sidelight, HM
frame and gyp. bd to ceiling.
Lino
(e)
T
Elect.
A191
EQ
Lino
2'-6"
3'-2"
Finish Floor
+ 100'-0"
Re-Paint sign / display wall.
Color as specified
Carpet
3
(e) Aluminum
threshold
4'-9"
(e) Carpet
2'-6"
3'-6"
3'-0"
clear min.
2
A1.1
Pattern
orientation
1 & 1A
sim.
4
A1.2
Office
A101A
-Demolition plans
-Special systems plan
Reception
A101
42" Tall service counter
Office
A101A
Carpet
Hallway
8'-10 1/4"
8'-2 5/8"
30" Tall desk w/
(5) work stations
Hallway
Remove (e) carpet
vinyl base complete.
Remove desk complete.
(e) Carpet
5'-2" V.I.F.
DATE: October 3, 2013
REV:
A1.1
(see A1.4)
Remove (e) carpet
& vinyl base complete
2" ø Cable grommets to
match counter (typ of 5)
Hallway
4
A1.2
(e) VCT
-Floor plans
Corridor
Carpet #2
No Paint
Pattern
orientation
Carpet #2
A1.1
1'-0"
Reception
A101
3'-0"
Carpet
(e) Display rack
Lino
Align
(e) Aluminum
threshold
(e) Doors & glass
panels to remain
Power / data below counter
- See Power & Special
Systems Plan on this sheet
Desk w/ (1) work station
100% Construction
Documents
Corridor
STAMP
2
Lobby & MCO Reception Floor Plan
Scale: 3/16" = 1'-0"
1
Lobby & MCO Reception Demo Plan
Scale: 3/16" = 1'-0"
Existing items to
be demolished complete.
Existing construction to remain.
OF N EW M E
X
O
IC
WALL LEGEND
TE
SAMUEL M.
STERLING
RE
No. 3077
G
ST
T
Lino
Project 1:
MCO Reception Desk
& Lobby Remodel.
EC
(e) VCT
525 Buena Vista Blvd SE
Albuquerque, NM 87106
Remove door opener pushbutton
(e) Pair of automatic door
hold-opens & exposed
conduit to remain
- Install new flooring under
(e) conduit
Hallway
CNM Main Campus:
Building A MCO Renovations
7
Paint column
Remove doors and sidelights
Remove tile and walk off mat and
prepare surface of entire vestibule for
new recessed mat
A1.1
Vestibule
A100A
Mat
Remove brick wing wall
SF-1
I
I
T
Lino
SF-2
ST
A
(e) VCT
Lobby
A100
4/A1.1
New recessed steel floor
access cover
ER
E D ARC
H
10'-2 1/2"
V.I.F
Fl
oor
Vau
lt L
id
E.Q
3'-0"
3'-0"
3'-0"
E.Q
1'-3"
2"
G2
S
S
A
SAM STERLING ARCHITECTURE , llc
G1
Lobby & Reception
924 2nd street nw suite c
albuquerque, new mexico 87102
o: 505 232-2520 f 505.232.2521
www.samsterlingarchitecture.com
T
EQ
G2
G2
G2
4'-0"
8'-7"
7'-0"
8'-7"
V.I.F
G1
EQ
4'-0"
G2
Wireless (RF) push button (Typ.)
Building A Key Plan
Not to Scale
2'-10"
Clear anodized aluminum storefront
assembly w/insulated glazing. See
door schedule for door type and
hardware schedule
Exterior
3
SF-2 Vestibule A100A Storefront Elevation(interior)
4
3/8" = 1"
Vestibule 100A
SF-3 Vestibule A100B Storefront Elevation
5
3/8" = 1"
Vestibule A100A West Elevation
3/8"=1'-0"
Existing wall
Sealant
Verify in field to match location of existing doors
Caulk
Thermally broken aluminum
storefront door/glazing in existing
opening
New 6" recessed can light to match
adjacent
10'-2 1/2"
New 2x2 ACT
VESTIBULE
EXTERIOR
V.I.F
E.Q.
3'-0"
2"
3'-0"
New Gyp. B Ceiling
Existing exit sign to remain Match Existing
(Protect during construction)
E.Q.
New Ceiling
8'7"
Relocate existing 2x4 luminaire.
Replace Lens
Storefront
1'-3"
E.Q.
2"
E.Q.
G1
G1
G1
Existing exit sign to remain
(Protect during construction)
Scale: 3/4" = 1'0"
(e) Corrugated metal roof deck
B./(E) Roof Deck
Lobby
A100
7'-0"
11'-8"
Metal stud staggered 24" O.C.
connected to concrete deck w/bent
stud or 16 ga angle
Clear anodized aluminum storefront
assembly w/insulated glazing. See
door schedule for door type and
hardware schedule
Bent stud or 16 ga. angle w/ #8 self
tapping screws
8"
V.I.F
8'-7"
G1
Storefront detail Entry Door/Glazing Jamb (Head Sim.)
CL
G1
1
PROJECT
CNM Main Campus:
Building A MCO Renovations
525 Buena Vista Blvd SE
Albuquerque, NM 87106
Metal track
B./(e) ACT
SF-1 Vestibule A100A Storefront Elevation (exterior)
9'-9"
(e) Suspended acoustic ceiling system
3/8" = 1"
5/8" painted gyp. bd. both sides of wall
- Terminate gyp. bd. at deck
B./(e) ACT
GLAZING SCHEDULE
G1
G2
1/4"
INSULATING
NOTES
SHGC
1" I.G.U.
Solarban 60 Starphire (clear) tempered
0.41
Clear tempered
NA
7'-7"
Bulkhead opening
A1.1
7
Avg. U-Value
0.28
7'-2"
New bulkhead. See detail 7 this sheet
NA
Note: Provide tempered glazing where required by code.
6
7
MCO - vestibule RCP
Scale: 3/16" =1'-0"
Bulkhead Section
3/4" = 1-0"
A1.1
Project 1:
MCO Reception Desk
& Lobby Remodel.
- Details
- RCP
- Elevations
2'-2"
Flush to finish floor
DATE: October 3, 2013
Fastener (removable)
REV:
Linoleum tile finish surface
over aluminum smooth
surface.
1/4" Aluminum smooth plate
cover
1/8" recess in cover
1/8" Aluminum Structure
100% Construction
Documents
Existing steel perim. frame
2'-2"
New 1" angle bracket
1/8" Aluminum structural frame
STAMP
1-1/2" = 1'-0"
SAMUEL M.
STERLING
No. 3077
ST
I
Floor Vault New Lid - Plan
1-1/2" = 1'-0"
OF N EW M E
X
G
8
Floor Vault New Lid - Section
RE
9
TE
O
IC
ST
A
EXISTING UTILITY VAULT
T
MONOLITHIC
EC
MARK
3 5/8" 25 ga metal stud min 16" O.C.
SHEET INFO
I
T
2
ER
E D ARC
H
Fl
oor
Vau
lt L
id
ADDITIVE ALTERNATE #1
S
S
A
SAM STERLING ARCHITECTURE , llc
Lobby & Reception
924 2nd street nw suite c
albuquerque, new mexico 87102
o: 505 232-2520 f 505.232.2521
www.samsterlingarchitecture.com
T
Building A Key Plan
Not to Scale
9
Additive Alternate - Existing condition
NNTS
New Work
6'-0 5/8"
New in-fill wall:
3-5/8 Metal stud wall w/ 5/8" gyp. bd.
Paint to match existing.
New 3/4" plywood backing @
48" to 72" Installed behind gyp.
board.
New 1" power and data
conduit and recepticals
roughed in for future flat
screen
7'-0"
Demolition
Remove roll-up window.
Remove Gyp. board pilasters
Remove plastic laminate panel
and counter surface
Existing conduit for power & data.
Re-route around glass block & conceal conduit wall.
Patch & Paint as necessary.
Additive Alternate - Elevation (View from Lobby A100)
3/8"=1'-0"
7
New wall base as specified
Additive Alternate - Elevation (View from inside office/storage 102)
3/8"=1'-0"
8
PROJECT
Solid surface service counter
(e) Electric panel
Mitered joints (typ)
1 1/2"
4"
Power / data as specified
- See Power & Special
Systems Plan this sheet
P-lam
B - 1/2"
A - 2"
B - 1 1/2"
A - 1/2"
B - 1/2"
A - 1"
B - 4"
A - 1/4"
B - 7"
A - 1/4"
B - 1"
P-lam toe kick
C - 1'-8"
C - 9"
C - 1/2"
C - 1/2"
C - 10"
C - 1'-3"
C - 2"
C - 8"
C - 2'-0"
Casework - Section Detail
C - 2'-0"
31/2" x 71/2" x 1/2" thick steel base plate
w/ 1/2" ø expansion bolts
w/3 1/2" embedment
4
Scale: 3/16" = 1'-0"
Project 1:
MCO Reception Desk
& Lobby Remodel
P-lam
- Color: CNM Yellow
- Color: CNM Blue
- Color: CNM White
C - 3 3/4"
5
MCO Reception Power & Special Systems Plan
A1.2
Mitered joints (typ)
C - 2'-0"
6
Solid surface counter
& matching end panels
3 5/8" Metal studs @ 12" o.c.
(double wall)
3 1/2" x 3 1/2" x 31" tall TS column
Carpet tile over
(e) conc. slab
(typ)
4
(typ)
5
SHEET INFO
A - 1/4"
B - 2"
3'-6"
27" clear min.
2'-6"
2
3"
C - 2'-0"
1-1/2" x 1-1/2" TS
brackets (typ of 9)
- Attach to metal studs
3" wide 12 ga. cont. horizontal strapping welded to
horizontal support tubes.
P-lam face panels over
(2) 1/4" adhered substrate at curves.
1 1/2"
Solid surface desk
4"
1
3"
Reception
A101
3
Homasote pin-up panel
over 5/8 gyp. bd.
- Adhere w/construction adhesive
525 Buena Vista Blvd SE
Albuquerque, NM 87106
1/8" Gap
Solid surface end panel (typ)
3'-6"
T
Elect.
A191
CNM Main Campus:
Building A MCO Renovations
Color C p-lam toe kick
Scale: 3/4" = 1'-0"
1A
Reception Desk - East Elevation FLAT
- Interior Elevations
- Desk Details
- Additive Alternate
Scale: 3/8" = 1'-0"
DATE: October 3, 2013
REV:
Solid surface desk w/
matching end panels
Mitered joints (typ)
Cable grommet to
match solid surface
1 1/2"
STAMP
Scale: 3/8" = 1'-0"
2
Reception - South Elevation
Scale: 3/8" = 1'-0"
ST
A
true elevation
curved
Radius = 18'-6"
- V.I.F. w/Architect
prior to fabrication
(see plan)
P-lam toe kick
1
Reception - East Elevation
Scale: 3/8" = 1'-0"
No. 3077
ST
T
2'-6"
3'-6"
4
A1.1
I
3
Reception - West Elevation
SAMUEL M.
STERLING
G
P-lam over 3 5/8 metal
stud frame below desk
P-lam toe kick
P-lam over 3 5/8 metal
stud frame below desk
OF N EW M E
X
EC
4
A1.1
TE
RE
Radius = 18'-6"
- V.I.F. w/Architect
prior to fabrication
(see plan)
true elevation
P-lam face panel
I
T
curved
2'-4 1/2"
(27" clear min.)
4"
Power / data ports
as specified (typ of 5)
3'-6"
TS steel brackets (typ of 9)
1 1/2"
Homasote pin-up panel
(27" clear min.)
2'-4 1/2"
1 1/2"
(5) Cable grommets to
match solid surface
4"
1 1/2"
1 1/2"
Solid surface desk w/
matching end panels
O
IC
2'-6"
3'-6"
P-lam face panels
Solid surface desk w/
matching end panels
& p-lam face panel
Solid surface desk w/
matching end panels
100% Construction
Documents
ER
E D A RC
H
Fl
oor
Vau
lt L
id
S
S
A
SAM STERLING ARCHITECTURE , llc
924 2nd street nw suite c
albuquerque, new mexico 87102
o: 505 232-2520 f 505.232.2521
www.samsterlingarchitecture.com
T
Terminate (e) duct from
VAV 48 and reconnect register
to VAV 46
MCO Office
7
Patch / repair ACT from
demolition of wall to soffit
as indicated by hatch
- Match (e) grid & tiles
5
6
Building A Key Plan
Not to Scale
(e)
T
5
1
(e) Existing ACT ceiling
T
lo
Re
3
cat
e
Extend gyp. bd. soffit to match (e)
(e) Gyp. bd. soffit
+ 8'-5"
A.F.F.
Re-connect (e) register to new duct
as indicated
Office
A101D
T
(e) ACT
+ 8'-6"
A.F.F.
(e) VAV 47
(e)
3
Remove (e) data raceway and
re-route cabling in new wall
Office
A101D
Relocate (e) light fixture
- All light fixtures in Office A101D
to be on single switch
- See Power Plan this sheet
5
To
10" o.d.
(e) VAV 48
Terminate (e) duct from VAV 46
and reconnect register to VAV 48
4
6
10" o.d.
2
(typ)
(e) VAV 46
10" o.d.
4
(typ)
5
FLOOR PLAN NOTES
2
Dimensions:
A. All dimensions to face of finish unless otherwise noted.
B. Field verify all existing structure and conditions.
C. Field verify rough openings of door and openings.
Terminate (e) duct from VAV 48
and reconnect register to VAV 47
(typ)
1
FINISH & MATERIAL NOTES
Gyp Board:
A. Texture to match (e).
Paint:
A. All new paint to match (e). Verify w/Owner and Architect.
B. Paint all exposed conduit, data boxes and j-boxes to match
adjacent wall.
3
Office A101D RCP & Mechanical Plan
4
Scale: 3/16" = 1'-0"
Office A101D Power & Special Systems Plan
Scale: 3/16" = 1'-0"
Receptacles / Data Ports / Coverplates:
A. All new receptacles, data ports & coverplates to match
color & style of existing.
POWER & SPECIAL SYSTEMS KEYED NOTES
New duct work. (size as noted) connected as indicated.
1. Relocate existing switch to new location shown.
Re-circuit lighting in this new room to be controlled by this
single switch.
Existing duct work
2. 20A, 120V Duplex receptacle, at 18" A.F.F. (typical).
3. Extend (2) #12, (1) #12G in .75" conduit to 20A/1P spare
circuit breaker in existing electrical panel.
Extend wall to deck and
provide acoustic insulation
Systems furniture by Owner
(O.F.O.I.)
Remove (e) gyp. bd. in Storage
A101D
Demolish (e) wall, door & sidelight
complete at Storage A101D
Remove (e) vinyl base
5. Provide and install (1) 1" conduits to 6" above accessible
ceiling for data / comm wiring by others.
6. Disconnect and remove existing duplex receptacle.
7. Power & communication junction boxes and flexible whip
connection to system furniture. Coordinate back box
location and connection with Owner-furnished furniture.
12'
Storage
A101D
-0 "
Carpet
Finish Floor
+ 100'-0"
.4
(e) Carpet
CNM Room sign reused from storage
demolition in this project
HM Frame / flush wood door w/side lite
- See Schedules A1.3
Line of (e) soffit above
1B
/A1
Office
A101D
.4
( e)
C
et
ar p
Ca
r
1. Divide CFM from VAV unit equally among all supply diffusers
served by VAV unit.
ab l
nf t r
o
C
6 ' wn e
3' x by O
Remove (e) carpet
& vinyl base complete
e
Open Office Area
Remove (e) data raceway and
re-route cabling in new wall
Systems furniture / panels
by Owner
pe t
15'
A101
Remodel
2. Ceiling space is tight - resize ductwork to maintain same
free area as required. FIELD VERIFY ALL CONDITIONS.
-Demolition Plan
3. Relocate existing thermostat and wiring as shown and
recalibrate to proper operation.
- Special Systems Plan
4. Install sound boot on 24" x 12" return grille per Detail 4 / A1.4
Run boot through wall above ACT and seal all around on both
sides of wall.
-0 "
Project 2:
MCO Office A101D
- Floor Plan
- RCP & Mech. Plan
5. Existing thermostat to remain.
6. Duct to penetrate wall at 90º.
DATE: October 3, 2013
WALL LEGEND
REV:
Existing wall to be demolished complete.
Wall Type A: 3-5/8 Metal stud wall extension w/ 5/8" gyp. bd.
on top of (e) wall w/acoustic batt insulation to deck.
Wall Type B: 3-5/8 Metal stud wall w/5/8" painted gyp. bd.
w/acoustic batt insulation to deck. Gyp. bd. finish to match (e).
100% Construction
Documents
STAMP
2
Office A101D Floor Plan
Scale: 3/16" = 1'-0"
1
Storage / Office A101D Demo Plan
Scale: 3/16" = 1'-0"
TE
E
OF N W M E
X
O
IC
SAMUEL M.
STERLING
RE
No. 3077
G
ST
T
Open Office Area
.4
MECHANICAL KEYED NOTES
A1.3
EC
2
A1
n
tter
Pa tation
n
o ri e
Remove room sign and save for
reuse in this project
SHEET INFO
I
I
T
/A1
525 Buena Vista Blvd SE
Albuquerque, NM 87106
ST
A
1A
CNM Main Campus:
Building A MCO Renovations
4. 4" Square box with single-gang mud-ring for data / comm
outlets by others (typical).
(e) 4x4 TS column to remain (typ)
- Paint to match HM frame
Paint (e) to match & provide new vinyl
base
PROJECT
ER
E D ARC
H
Fl
oor
Vau
lt L
id
S
S
A
SAM STERLING ARCHITECTURE , llc
924 2nd street nw suite c
albuquerque, new mexico 87102
o: 505 232-2520 f 505.232.2521
www.samsterlingarchitecture.com
T
MCO Office
Building A Key Plan
Not to Scale
DOOR SCHEDULE
LOCATION
QTY
ID
ROOM N0
SIZE
W
H
DOOR
TYPE
FRAME
HARDWARE
SET #
GLAZING
SPECIAL NOTES
A100-A1
A100A
PR
3'0"
6'10"
Wide stile
glass SF
door
Swing
SF
1
1" IGU tempered See Detail 4/A1.1
A100-A2
A100A
PR
3'0"
6'10"
Wide stile
glass SF
door
Swing
SF
2
1" IGU tempered See Detail 5/A1.1
A100C
A100A
1
3'0"
6'8"
Flush panel
solid-core
wood
Swing
HM
3
NA
A100B
A100B
1
3'0"
6'8"
Wide stile
glass SF
door
Swing
SF
4
NA
A101
A101D
1
3'0"
7'0"
Flush panel
solid-core
wood w/lite
Swing
HM
5
5/8" IGU,
tempered
See Detail 8/A1.1
- w/1'-2" Wide side lite
- finish to match existing
See detail 3/A1.3
Hanger straps
- Connect to structure
PROJECT
CNM Main Campus:
Building A MCO Renovations
Fabricate of sheetmetal w/1"
interior acoustic lining
- Paint inside flat black
D
1/2"
B./(e) Open Web Joists
10'-4
HM frame & door to match (e) in MCO Department
- Verify w/Owner & Architect
- Anchor per manuf's recommendation
- See Schedules this sheet
Opening to match size neck
size of return air grille
(e) Return air grille
- Verify size in field
3
HM Frame Jamb - Detail (Head sim)
Unfaced formaldehyde-free
acoustic batt insulation (typ)
SHEET INFO
A1.4
(e) Suspended acoustic ceiling system
Scale: 1 1/2" = 1'-0"
Project 2:
MCO Office A101D
Remodel
B./(e) ACT
8'-6"
(e) Suspended acoustic ceiling system
5/8" painted gyp. bd. both sides of wall
- Terminate gyp. bd. at deck
- Wall Sections
- Interior Elevations
3 5/8" 25 ga metal studs @ 16" o.c.
- Secure track at top
Area of (e) wall to be
extended to deck (wall type 1A)
(e) Gyp. bd. soffit
OPEN OFFICE AREA
Unfaced formaldehyde-free
acoustic batt insulation (typ)
OFFICE A101D
1'-10"
Existing wall
Open Office Area
- Details
- Door Schedule
Office A101D
DATE: October 3, 2013
REV:
100% Construction
Documents
STAMP
4" Vinyl wall base as specified,
both sides of wall
Continuous acoustic sealant at floor (typ)
(e) Carpet over concrete slab (typ)
Wall base as specified
true
oblique
Interior Elevation
Type A Wall Section (Existing Wall Extension)
Scale: 3/4" = 1'-0"
Scale: 3/4" = 1'-0"
SAMUEL M.
STERLING
No. 3077
ST
I
1A
Type B Wall Section (New Wall)
E
OF N W M E
X
G
Scale: 3/8" = 1'-0"
1B
RE
2
(e) Finish Floor
100'-0"
Data as specified
(e) Power
TE
O
IC
Power & data as specified
Carpet tile as specified over (e) conc. slab
T
Painted gyp. bd.
to match (e)
EC
Scale: 3/4" = 1'-0"
Continuous acoustic sealant at deck (typ)
9'-6"
Return Air Sound Elbow Detail
B./(e) Open Web Joists
10'-4
3 5/8" 25 ga metal studs @ 16" o.c.
- Secure track at top
Flush wood door
- See Schedules this sheet
B./(e) ACT
8'-6"
4
Continuous acoustic sealant at deck (typ)
5/8" painted gyp. bd. both sides of wall
- Terminate gyp. bd. at deck
(e) Open-web steel joists at 4'-0" o.c.
I
T
Opening to match
neck size of
return air grille
(e) Open-web steel joists at 4'-0" o.c.
5/8" Painted gyp. bd. over 3 5/8" metal
studs both sides of wall
- Finish to match (e)
ST
A
6" min.
1/2"
B./(e) Roof Deck
11'-4"
B./(e) Roof Deck
11'-4"
5/8"
Wall Type B
2D
3 5/8"
(e) Corrugated metal roof deck
Extend (e) wall to deck
5/8"
D
(e) roof deck
Wall Type A
4 7/8"
525 Buena Vista Blvd SE
Albuquerque, NM 87106
ER
E D A RC
H
S
S
A
SAM STERLING ARCHITECTURE , llc
SITE: CNM Main Campus Building A Marketing & Communications Office
PROJECT INFO:
APPLICABLE CODES:
924 2nd street nw suite c
albuquerque, new mexico 87102
o: 505 232-2520 f 505.232.2521
www.samsterlingarchitecture.com
2009 International Building Code
2009 New Mexico Commercial Building Code
2009 New Mexico Existing Building Code
2009 New Mexico Mechanical Code
2011 New Mexico Electrical Code
2007 New Mexico Electrical Safety Code
Project 1:
MCO RECEPTION DESK AND LOBBY REMODEL
1A - Demolition: Remove existing built in desk in Reception A101. Remove brick wing wall at vestibule A100B. Remove doors, HM frames, sidelights walk-off mat and ACT at Vestibules A100A and A100B. Remove ceiling in
A100A. Remove flooring in Lobby A100 and Reception A101, carpet in Office A101A and tile in vestibule A100A.
1B - Desk: New reception desk in Reception A101.
1C - Entry Vestibules: New storefront glazing and doors. New wall, door and HM frame in vestibule A100A for storage. New ceilings and lights. New ADA push buttons for door openers.
1D - Flooring: New carpet in Reception A101 and office A101A. New linoleum flooring and carpet in Lobby A100. New access hatch to existing floor vault. Linoleum and walk-off mats in vestibules A100A/B
Central New Mexico Community College
CNM Physical Plant
Jennifer Davis, Project Manager
Facilities Administration
525 Buena Vista Dr. SE
Albuquerque, NM 87106
t: 505.224.4578
f: 505.224.4566
email: jutrata1@cnm.edu
Sam Sterling Architecture, llc
Sam Sterling, AIA, Principal
Bron Heintz, Project Manager
924 2nd Street NW Suite C
Albuquerque, New Mexico, 87102
p: 1.505.232.2520 f: 1.505.232.2521
e: sam@samsterlingarchitecture.com
e: bron@samsterlingarchitecture.com
1.
2.
3.
15.
ADDITIVE ALTERNATE #1 (see 7/8 A1.2)
16.
17.
18.
2A - Demolition: Remove partition wall at A101D Storage room. Remove carpet and base, and surface mounted data raceway.
1A - Demolition: Remove roll-up door, built in counter, pilasters and vertical plastic laminate panel at east wall of lobby A100.
N
Location Map: COA ZONE MAP K15
Not to Scale
GENERAL NOTES
2C - Systems: Power and Data as required in new walls. Minor reconfiguration of existing HVAC ductwork. Minor reconfiguration of existing lights.
MCO OFFICE A101D REMODEL
Coal Avenue SE
ARCHITECT:
2B - Construction: New partition walls at new Office A101D. Install new carpet wall base and door and HM frame with sidelight. Paint all walls. Some minor repairs to acoustic tile ceiling.
1F - Systems: Power and Data as indicated at new reception desk
Alternate 1:
OWNER:
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
1E - Paint: Paint gyp. board walls and exposed tube steel columns in Lobby A100.
Project 2:
SU-2 / O-1
19.
2A - Construction: Infill with new gypsum board wall to match existing. Install a 3/4" plywood backing on lobby side portion of wall under gypsum. Paint to match.
2B - Power/Data: Re-route existing conduit inside wall and rough in 2 new recepticals.
All work to conform to all applicable codes and ordinances.
All dimensions are to face of finish unless otherwise noted.
General Contractor must contact Architect during demolition for assessment of existing construction. Changes in detailing may be
required as a result of new findings during construction.
General Contractor must field verify existing conditions and dimensions and notify the Architect of any discrepancies.
All colors and materials to be reviewed and selected by the Architect from manufacturer's standards provided by the Contractor.
General Contractor shall minimize noise and dust. All trash and debris shall be removed on a daily basis.
General Contractor is responsible for repairing all damage as a result of construction.
All doors to have accessible hardware.
Provide all blocking, backing, and additional supporting structure as required for items called for in the drawings and specifications.
Patch & repair all finishes affected by demolition to match existing.
All new construction must be coordinated with existing site conditions.
Locate and protect all existing underground utilities.
General Contractor to coordinate with Owner's security system & IT consultant to allow system pre-wiring as required.
Discrepancies: The General Contractor shall compare and coordinate the information shown on all drawings. Where in the opinion
of the General Contractor a discrepancy exists, it shall be promptly reported to the Architect for proper clarification or adjustment.
Omissions: In the event that certain features of the construction are not fully shown on the drawings, then their construction shall
be the same character as the construction of similar conditions that are shown or noted on the drawings and specifications. If there
is any doubt concerning the similarity of the condition, the General Contractor shall notify the Architect and request clarification.
The General Contractor shall coordinate with the Owner all Owner-installed items and equipment.
The General Contractor shall verify required rough opening size for all doors and windows.
The General Contractor shall verify that there are no conflicts between openings in walls or slabs and structural, mechanical,
electrical and/or plumbing requirements. In the event that a conflict occurs, the General Contractor shall notify the Architect
immediately.
Definitions:
A. Provide: Furnish and install, complete with all necessary accessories, ready for intended use. Pay for all related costs.
B. Approved: Acceptance of item submitted for approval. Not a limitation or release from compliance with the Contract
Documents or regulatory requirements.
C. Match Existing: Match existing as acceptable to the Owner and the Architect.
DRAWING INDEX:
Project Data
A1.0
Project 1: MCO Reception Desk & Lobby Remodel
- Demolition Plan
- Floor Plan
- Power & Special Systems Plan
A1.1
Project 1: MCO Lobby Remodel Details
- Interior Elevations
- Reflected Ceiling Plan
- Storefront Elevations
A1.2
Project 1: MCO Reception Desk Details
- Interior Elevations
- Casework Section Detail
A1.3
Project 2: MCO Office A101D Remodel
- Demolition Plan
- Floor Plan
- Reflected Ceiling Plan & Mechanical Plan
- Power & Special Systems Plan
A1.4
Project 2: MCO Office A101D Remodel
- Wall Section
- Interior Elevation
-Details
- Door / Hardware Schedule
WORK COVERED BY CONTRACT DOCUMENTS
1.
2.
3.
4.
Permits: Unless otherwise noted, the General Contractor shall apply for, obtain, and pay for permits required to perform the work.
Copies shall be submitted to the Architect.
Intent:
A. Construction Documents are intended to provide the basis for proper completion of the work suitable for the intended use of
the Owner. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the
project shall be included. The General Contractor shall furnish all labor, services, and material, etc. as required
to complete the project. Accordingly, the General Contractor shall determine the subdivision of all work for the various
trades, subcontractors and suppliers.
B. All work and materials are not necessarily covered in both the drawings and specifications; such items, however, are a part
of the work under this Contract if shown or called for by any of the Contract Documents.
C. The work of any one trade, subcontractor, or supplier is not necessarily grouped into one section of the specifications or
on one portion of the drawings; all persons shall check all specifications and all drawings to determine the full extent of the
work for which they are responsible.
Taxes: The General Contractor and all subcontractors shall pay all sales, consumer, Gross Receipts, and other similar taxes
required by law.
General Guaranty: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire
occupancy of the project by the Owner shall constitute acceptance of work not done in accordance with the Contract Documents or
relieve the Contractor of liability in respect to any expressed warranties or responsibility for faulty materials or workmanship. The
Contractor shall remedy all defects in the work and pay for damages to other work resulting therefrom, which shall appear within a
period of one (1) year from the date of Substantial Completion of the work under the Contract. The Owner will give notice of
observed defects with reasonable promptness.
WORK BY OTHERS
1.
2.
Data/phone/security/J-boxes: General Contractor to provide conduit and pull strings per drawings. Data & security cabling to be
installed by Owner, or owners sub-contractor. General Contractor to coordinate work with Owner. General Contractor to ensure that
system conduit installation is complete, and all device locations are correct prior to covering.
Furniture: All mountable furniture & systems furniture shown on drawings are by Owner.
HAZARDOUS MATERIALS
1.
Hazardous materials report on file with Owner.
SALVAGE ITEMS
All door hardware
Doors
Door openers and closers
Roll-up window in Lobby A100 (Alternate)
CNM Main Campus:
Building A MCO Renovations
525 Buena Vista Blvd SE
Albuquerque, NM 87106
SHEET INFO
G1.0
Project Data
DATE: October 3, 2013
REV:
GENERAL SYMBOL LEGEND:
XX
Structural grid
xx
Building section
1/A3.0
1/A3.0
Wall section
1/A2.0
Exterior elevation
1
A6.0
Detail (section)
1
A6.0
Detail (plan)
Revision
xx
1
Interior elevation
Keyed note
Elevation benchmark
(e)
Existing
F.O.F.
Face of finish
O.F.C.I
Owner furnished,
Contractor installed
O.F.I.O.
A4.0
Storefront ID
100% Construction
Documents
Owner furnished,
installed by Others
STAMP
Entry
100
Room ID
#
Door ID
TE
E
OF N W M E
X
O
IC
1.
2.
3.
4.
PROJECT
G1.0
SAMUEL M.
STERLING
RE
No. 3077
G
ST
T
SCOPE OF WORK:
ZONING:
EC
BUILDING A MARKETING AND COMMUNICATIONS OFFICE (MCO) RENOVATIONS 100% CONSTRUCTION DOCUMENTS
Lot: University Heights / TVI
Subdivision: University Heights Elementary School
UPC: 101505743810540410
I
I
T
Main Campus
Bldg. A
ST
A
Central New Mexico Community College
CNM Main Campus
525 Buena Vista Blvd SE
Albuquerque, New Mexico 87106
Buena Vista Dr. SE
LEGAL DESCRIPTION:
ER
E D ARC
H