Fl oor Vau lt L id T Elect. A191 (e) Electric panel FLOOR PLAN NOTES 1. Provide and install (2) 1 1/4” conduits to 6" above accessible ceiling for data/comm wiring by others. Extend conduits under floor from east to desk. Dimensions: A. All dimensions to face of finish unless otherwise noted. B. Field verify all existing structure and conditions. C. Field verify rough openings of door. 2. Saw-cut floor and run conduits under floor and extend as indicated. At completion floor shall be repaired as appropriate for new finish. 3 1 Reception A101 POWER & SPECIAL SYSTEMS KEYED NOTES 2 S S A SAM STERLING ARCHITECTURE , llc Lobby & Reception FINISH & MATERIAL NOTES 3. Extend 4#12, 1#12g in .75” conduit to (2) 20a/1p spare circuit breakers in existing electrical panel located in Rm A191. Gyp Board: A. Texture to match (e). 4. 20a, 120v duplex receptacle in single gang box, up 18” a.f.f. (typical). Paint: A. All new paint to match (e). Verify w/Owner and Architect. B. Paint all exposed conduit, data boxes and j-boxes to match adjacent wall. 5. 4” Square box with single-gang mud-ring for recessed data/comm outlets by others (typical). T Receptacles / Data Ports / Coverplates: A. All new receptacles, data ports & coverplates to match color & style of existing. 6. Disconnect and remove existing receptacles and data/comm outlets completely along with condut and wiring. 924 2nd street nw suite c albuquerque, new mexico 87102 o: 505 232-2520 f 505.232.2521 www.samsterlingarchitecture.com Building A Key Plan Not to Scale (typ) 4 (typ) 5 6 MCO Reception Power & Special Systems Plan 3 Scale: 3/16" = 1'-0" ADDITAVE ALTERNATE #1 Remove Roll-up window and counter. See Sheet A1.2 ADDITAVE ALTERNATE #1 New gyp. bd. wall to match existing. Paint walls in lobby A100. See Sheet A1.2 Vestibule A100B 8/A1.2 SF-3 BOLD DASHED LINE DENOTES THE AREA OF WORK 3 '- Office / Storage A102 9" 1 A1.1 (e) New recessed floor mat. Enlarge existing recess to accomodate new mat. Remove ACT ceiling and grid and light fixture Vestibule A100B Remove metal hand rail Ma Remove ACT ceiling, grid & light Lino t New floor mat Li n Remove floor mat PROJECT o 7/A1.2 Lino Linoleum / Carpet A100-A2 Finish Floor + 100'-0" A100-A1 Lobby A100 Vestibule A100A 6'-8" EQ Remove mesh railing and door pushbutton Pattern orientation Carpet tile #1/ seating area - Contractor to remove and reset (e) furniture . Coordinate furniture schedule with owner. Mechanically remove (e) flooring & vinyl base complete 18'-4" SHEET INFO A1.0 T Patch and Paint walls Elect. A191 Remove door, sidelight, HM frame and gyp. bd to ceiling. Lino (e) T Elect. A191 EQ Lino 2'-6" 3'-2" Finish Floor + 100'-0" Re-Paint sign / display wall. Color as specified Carpet 3 (e) Aluminum threshold 4'-9" (e) Carpet 2'-6" 3'-6" 3'-0" clear min. 2 A1.1 Pattern orientation 1 & 1A sim. 4 A1.2 Office A101A -Demolition plans -Special systems plan Reception A101 42" Tall service counter Office A101A Carpet Hallway 8'-10 1/4" 8'-2 5/8" 30" Tall desk w/ (5) work stations Hallway Remove (e) carpet vinyl base complete. Remove desk complete. (e) Carpet 5'-2" V.I.F. DATE: October 3, 2013 REV: A1.1 (see A1.4) Remove (e) carpet & vinyl base complete 2" ø Cable grommets to match counter (typ of 5) Hallway 4 A1.2 (e) VCT -Floor plans Corridor Carpet #2 No Paint Pattern orientation Carpet #2 A1.1 1'-0" Reception A101 3'-0" Carpet (e) Display rack Lino Align (e) Aluminum threshold (e) Doors & glass panels to remain Power / data below counter - See Power & Special Systems Plan on this sheet Desk w/ (1) work station 100% Construction Documents Corridor STAMP 2 Lobby & MCO Reception Floor Plan Scale: 3/16" = 1'-0" 1 Lobby & MCO Reception Demo Plan Scale: 3/16" = 1'-0" Existing items to be demolished complete. Existing construction to remain. OF N EW M E X O IC WALL LEGEND TE SAMUEL M. STERLING RE No. 3077 G ST T Lino Project 1: MCO Reception Desk & Lobby Remodel. EC (e) VCT 525 Buena Vista Blvd SE Albuquerque, NM 87106 Remove door opener pushbutton (e) Pair of automatic door hold-opens & exposed conduit to remain - Install new flooring under (e) conduit Hallway CNM Main Campus: Building A MCO Renovations 7 Paint column Remove doors and sidelights Remove tile and walk off mat and prepare surface of entire vestibule for new recessed mat A1.1 Vestibule A100A Mat Remove brick wing wall SF-1 I I T Lino SF-2 ST A (e) VCT Lobby A100 4/A1.1 New recessed steel floor access cover ER E D ARC H 10'-2 1/2" V.I.F Fl oor Vau lt L id E.Q 3'-0" 3'-0" 3'-0" E.Q 1'-3" 2" G2 S S A SAM STERLING ARCHITECTURE , llc G1 Lobby & Reception 924 2nd street nw suite c albuquerque, new mexico 87102 o: 505 232-2520 f 505.232.2521 www.samsterlingarchitecture.com T EQ G2 G2 G2 4'-0" 8'-7" 7'-0" 8'-7" V.I.F G1 EQ 4'-0" G2 Wireless (RF) push button (Typ.) Building A Key Plan Not to Scale 2'-10" Clear anodized aluminum storefront assembly w/insulated glazing. See door schedule for door type and hardware schedule Exterior 3 SF-2 Vestibule A100A Storefront Elevation(interior) 4 3/8" = 1" Vestibule 100A SF-3 Vestibule A100B Storefront Elevation 5 3/8" = 1" Vestibule A100A West Elevation 3/8"=1'-0" Existing wall Sealant Verify in field to match location of existing doors Caulk Thermally broken aluminum storefront door/glazing in existing opening New 6" recessed can light to match adjacent 10'-2 1/2" New 2x2 ACT VESTIBULE EXTERIOR V.I.F E.Q. 3'-0" 2" 3'-0" New Gyp. B Ceiling Existing exit sign to remain Match Existing (Protect during construction) E.Q. New Ceiling 8'7" Relocate existing 2x4 luminaire. Replace Lens Storefront 1'-3" E.Q. 2" E.Q. G1 G1 G1 Existing exit sign to remain (Protect during construction) Scale: 3/4" = 1'0" (e) Corrugated metal roof deck B./(E) Roof Deck Lobby A100 7'-0" 11'-8" Metal stud staggered 24" O.C. connected to concrete deck w/bent stud or 16 ga angle Clear anodized aluminum storefront assembly w/insulated glazing. See door schedule for door type and hardware schedule Bent stud or 16 ga. angle w/ #8 self tapping screws 8" V.I.F 8'-7" G1 Storefront detail Entry Door/Glazing Jamb (Head Sim.) CL G1 1 PROJECT CNM Main Campus: Building A MCO Renovations 525 Buena Vista Blvd SE Albuquerque, NM 87106 Metal track B./(e) ACT SF-1 Vestibule A100A Storefront Elevation (exterior) 9'-9" (e) Suspended acoustic ceiling system 3/8" = 1" 5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck B./(e) ACT GLAZING SCHEDULE G1 G2 1/4" INSULATING NOTES SHGC 1" I.G.U. Solarban 60 Starphire (clear) tempered 0.41 Clear tempered NA 7'-7" Bulkhead opening A1.1 7 Avg. U-Value 0.28 7'-2" New bulkhead. See detail 7 this sheet NA Note: Provide tempered glazing where required by code. 6 7 MCO - vestibule RCP Scale: 3/16" =1'-0" Bulkhead Section 3/4" = 1-0" A1.1 Project 1: MCO Reception Desk & Lobby Remodel. - Details - RCP - Elevations 2'-2" Flush to finish floor DATE: October 3, 2013 Fastener (removable) REV: Linoleum tile finish surface over aluminum smooth surface. 1/4" Aluminum smooth plate cover 1/8" recess in cover 1/8" Aluminum Structure 100% Construction Documents Existing steel perim. frame 2'-2" New 1" angle bracket 1/8" Aluminum structural frame STAMP 1-1/2" = 1'-0" SAMUEL M. STERLING No. 3077 ST I Floor Vault New Lid - Plan 1-1/2" = 1'-0" OF N EW M E X G 8 Floor Vault New Lid - Section RE 9 TE O IC ST A EXISTING UTILITY VAULT T MONOLITHIC EC MARK 3 5/8" 25 ga metal stud min 16" O.C. SHEET INFO I T 2 ER E D ARC H Fl oor Vau lt L id ADDITIVE ALTERNATE #1 S S A SAM STERLING ARCHITECTURE , llc Lobby & Reception 924 2nd street nw suite c albuquerque, new mexico 87102 o: 505 232-2520 f 505.232.2521 www.samsterlingarchitecture.com T Building A Key Plan Not to Scale 9 Additive Alternate - Existing condition NNTS New Work 6'-0 5/8" New in-fill wall: 3-5/8 Metal stud wall w/ 5/8" gyp. bd. Paint to match existing. New 3/4" plywood backing @ 48" to 72" Installed behind gyp. board. New 1" power and data conduit and recepticals roughed in for future flat screen 7'-0" Demolition Remove roll-up window. Remove Gyp. board pilasters Remove plastic laminate panel and counter surface Existing conduit for power & data. Re-route around glass block & conceal conduit wall. Patch & Paint as necessary. Additive Alternate - Elevation (View from Lobby A100) 3/8"=1'-0" 7 New wall base as specified Additive Alternate - Elevation (View from inside office/storage 102) 3/8"=1'-0" 8 PROJECT Solid surface service counter (e) Electric panel Mitered joints (typ) 1 1/2" 4" Power / data as specified - See Power & Special Systems Plan this sheet P-lam B - 1/2" A - 2" B - 1 1/2" A - 1/2" B - 1/2" A - 1" B - 4" A - 1/4" B - 7" A - 1/4" B - 1" P-lam toe kick C - 1'-8" C - 9" C - 1/2" C - 1/2" C - 10" C - 1'-3" C - 2" C - 8" C - 2'-0" Casework - Section Detail C - 2'-0" 31/2" x 71/2" x 1/2" thick steel base plate w/ 1/2" ø expansion bolts w/3 1/2" embedment 4 Scale: 3/16" = 1'-0" Project 1: MCO Reception Desk & Lobby Remodel P-lam - Color: CNM Yellow - Color: CNM Blue - Color: CNM White C - 3 3/4" 5 MCO Reception Power & Special Systems Plan A1.2 Mitered joints (typ) C - 2'-0" 6 Solid surface counter & matching end panels 3 5/8" Metal studs @ 12" o.c. (double wall) 3 1/2" x 3 1/2" x 31" tall TS column Carpet tile over (e) conc. slab (typ) 4 (typ) 5 SHEET INFO A - 1/4" B - 2" 3'-6" 27" clear min. 2'-6" 2 3" C - 2'-0" 1-1/2" x 1-1/2" TS brackets (typ of 9) - Attach to metal studs 3" wide 12 ga. cont. horizontal strapping welded to horizontal support tubes. P-lam face panels over (2) 1/4" adhered substrate at curves. 1 1/2" Solid surface desk 4" 1 3" Reception A101 3 Homasote pin-up panel over 5/8 gyp. bd. - Adhere w/construction adhesive 525 Buena Vista Blvd SE Albuquerque, NM 87106 1/8" Gap Solid surface end panel (typ) 3'-6" T Elect. A191 CNM Main Campus: Building A MCO Renovations Color C p-lam toe kick Scale: 3/4" = 1'-0" 1A Reception Desk - East Elevation FLAT - Interior Elevations - Desk Details - Additive Alternate Scale: 3/8" = 1'-0" DATE: October 3, 2013 REV: Solid surface desk w/ matching end panels Mitered joints (typ) Cable grommet to match solid surface 1 1/2" STAMP Scale: 3/8" = 1'-0" 2 Reception - South Elevation Scale: 3/8" = 1'-0" ST A true elevation curved Radius = 18'-6" - V.I.F. w/Architect prior to fabrication (see plan) P-lam toe kick 1 Reception - East Elevation Scale: 3/8" = 1'-0" No. 3077 ST T 2'-6" 3'-6" 4 A1.1 I 3 Reception - West Elevation SAMUEL M. STERLING G P-lam over 3 5/8 metal stud frame below desk P-lam toe kick P-lam over 3 5/8 metal stud frame below desk OF N EW M E X EC 4 A1.1 TE RE Radius = 18'-6" - V.I.F. w/Architect prior to fabrication (see plan) true elevation P-lam face panel I T curved 2'-4 1/2" (27" clear min.) 4" Power / data ports as specified (typ of 5) 3'-6" TS steel brackets (typ of 9) 1 1/2" Homasote pin-up panel (27" clear min.) 2'-4 1/2" 1 1/2" (5) Cable grommets to match solid surface 4" 1 1/2" 1 1/2" Solid surface desk w/ matching end panels O IC 2'-6" 3'-6" P-lam face panels Solid surface desk w/ matching end panels & p-lam face panel Solid surface desk w/ matching end panels 100% Construction Documents ER E D A RC H Fl oor Vau lt L id S S A SAM STERLING ARCHITECTURE , llc 924 2nd street nw suite c albuquerque, new mexico 87102 o: 505 232-2520 f 505.232.2521 www.samsterlingarchitecture.com T Terminate (e) duct from VAV 48 and reconnect register to VAV 46 MCO Office 7 Patch / repair ACT from demolition of wall to soffit as indicated by hatch - Match (e) grid & tiles 5 6 Building A Key Plan Not to Scale (e) T 5 1 (e) Existing ACT ceiling T lo Re 3 cat e Extend gyp. bd. soffit to match (e) (e) Gyp. bd. soffit + 8'-5" A.F.F. Re-connect (e) register to new duct as indicated Office A101D T (e) ACT + 8'-6" A.F.F. (e) VAV 47 (e) 3 Remove (e) data raceway and re-route cabling in new wall Office A101D Relocate (e) light fixture - All light fixtures in Office A101D to be on single switch - See Power Plan this sheet 5 To 10" o.d. (e) VAV 48 Terminate (e) duct from VAV 46 and reconnect register to VAV 48 4 6 10" o.d. 2 (typ) (e) VAV 46 10" o.d. 4 (typ) 5 FLOOR PLAN NOTES 2 Dimensions: A. All dimensions to face of finish unless otherwise noted. B. Field verify all existing structure and conditions. C. Field verify rough openings of door and openings. Terminate (e) duct from VAV 48 and reconnect register to VAV 47 (typ) 1 FINISH & MATERIAL NOTES Gyp Board: A. Texture to match (e). Paint: A. All new paint to match (e). Verify w/Owner and Architect. B. Paint all exposed conduit, data boxes and j-boxes to match adjacent wall. 3 Office A101D RCP & Mechanical Plan 4 Scale: 3/16" = 1'-0" Office A101D Power & Special Systems Plan Scale: 3/16" = 1'-0" Receptacles / Data Ports / Coverplates: A. All new receptacles, data ports & coverplates to match color & style of existing. POWER & SPECIAL SYSTEMS KEYED NOTES New duct work. (size as noted) connected as indicated. 1. Relocate existing switch to new location shown. Re-circuit lighting in this new room to be controlled by this single switch. Existing duct work 2. 20A, 120V Duplex receptacle, at 18" A.F.F. (typical). 3. Extend (2) #12, (1) #12G in .75" conduit to 20A/1P spare circuit breaker in existing electrical panel. Extend wall to deck and provide acoustic insulation Systems furniture by Owner (O.F.O.I.) Remove (e) gyp. bd. in Storage A101D Demolish (e) wall, door & sidelight complete at Storage A101D Remove (e) vinyl base 5. Provide and install (1) 1" conduits to 6" above accessible ceiling for data / comm wiring by others. 6. Disconnect and remove existing duplex receptacle. 7. Power & communication junction boxes and flexible whip connection to system furniture. Coordinate back box location and connection with Owner-furnished furniture. 12' Storage A101D -0 " Carpet Finish Floor + 100'-0" .4 (e) Carpet CNM Room sign reused from storage demolition in this project HM Frame / flush wood door w/side lite - See Schedules A1.3 Line of (e) soffit above 1B /A1 Office A101D .4 ( e) C et ar p Ca r 1. Divide CFM from VAV unit equally among all supply diffusers served by VAV unit. ab l nf t r o C 6 ' wn e 3' x by O Remove (e) carpet & vinyl base complete e Open Office Area Remove (e) data raceway and re-route cabling in new wall Systems furniture / panels by Owner pe t 15' A101 Remodel 2. Ceiling space is tight - resize ductwork to maintain same free area as required. FIELD VERIFY ALL CONDITIONS. -Demolition Plan 3. Relocate existing thermostat and wiring as shown and recalibrate to proper operation. - Special Systems Plan 4. Install sound boot on 24" x 12" return grille per Detail 4 / A1.4 Run boot through wall above ACT and seal all around on both sides of wall. -0 " Project 2: MCO Office A101D - Floor Plan - RCP & Mech. Plan 5. Existing thermostat to remain. 6. Duct to penetrate wall at 90º. DATE: October 3, 2013 WALL LEGEND REV: Existing wall to be demolished complete. Wall Type A: 3-5/8 Metal stud wall extension w/ 5/8" gyp. bd. on top of (e) wall w/acoustic batt insulation to deck. Wall Type B: 3-5/8 Metal stud wall w/5/8" painted gyp. bd. w/acoustic batt insulation to deck. Gyp. bd. finish to match (e). 100% Construction Documents STAMP 2 Office A101D Floor Plan Scale: 3/16" = 1'-0" 1 Storage / Office A101D Demo Plan Scale: 3/16" = 1'-0" TE E OF N W M E X O IC SAMUEL M. STERLING RE No. 3077 G ST T Open Office Area .4 MECHANICAL KEYED NOTES A1.3 EC 2 A1 n tter Pa tation n o ri e Remove room sign and save for reuse in this project SHEET INFO I I T /A1 525 Buena Vista Blvd SE Albuquerque, NM 87106 ST A 1A CNM Main Campus: Building A MCO Renovations 4. 4" Square box with single-gang mud-ring for data / comm outlets by others (typical). (e) 4x4 TS column to remain (typ) - Paint to match HM frame Paint (e) to match & provide new vinyl base PROJECT ER E D ARC H Fl oor Vau lt L id S S A SAM STERLING ARCHITECTURE , llc 924 2nd street nw suite c albuquerque, new mexico 87102 o: 505 232-2520 f 505.232.2521 www.samsterlingarchitecture.com T MCO Office Building A Key Plan Not to Scale DOOR SCHEDULE LOCATION QTY ID ROOM N0 SIZE W H DOOR TYPE FRAME HARDWARE SET # GLAZING SPECIAL NOTES A100-A1 A100A PR 3'0" 6'10" Wide stile glass SF door Swing SF 1 1" IGU tempered See Detail 4/A1.1 A100-A2 A100A PR 3'0" 6'10" Wide stile glass SF door Swing SF 2 1" IGU tempered See Detail 5/A1.1 A100C A100A 1 3'0" 6'8" Flush panel solid-core wood Swing HM 3 NA A100B A100B 1 3'0" 6'8" Wide stile glass SF door Swing SF 4 NA A101 A101D 1 3'0" 7'0" Flush panel solid-core wood w/lite Swing HM 5 5/8" IGU, tempered See Detail 8/A1.1 - w/1'-2" Wide side lite - finish to match existing See detail 3/A1.3 Hanger straps - Connect to structure PROJECT CNM Main Campus: Building A MCO Renovations Fabricate of sheetmetal w/1" interior acoustic lining - Paint inside flat black D 1/2" B./(e) Open Web Joists 10'-4 HM frame & door to match (e) in MCO Department - Verify w/Owner & Architect - Anchor per manuf's recommendation - See Schedules this sheet Opening to match size neck size of return air grille (e) Return air grille - Verify size in field 3 HM Frame Jamb - Detail (Head sim) Unfaced formaldehyde-free acoustic batt insulation (typ) SHEET INFO A1.4 (e) Suspended acoustic ceiling system Scale: 1 1/2" = 1'-0" Project 2: MCO Office A101D Remodel B./(e) ACT 8'-6" (e) Suspended acoustic ceiling system 5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck - Wall Sections - Interior Elevations 3 5/8" 25 ga metal studs @ 16" o.c. - Secure track at top Area of (e) wall to be extended to deck (wall type 1A) (e) Gyp. bd. soffit OPEN OFFICE AREA Unfaced formaldehyde-free acoustic batt insulation (typ) OFFICE A101D 1'-10" Existing wall Open Office Area - Details - Door Schedule Office A101D DATE: October 3, 2013 REV: 100% Construction Documents STAMP 4" Vinyl wall base as specified, both sides of wall Continuous acoustic sealant at floor (typ) (e) Carpet over concrete slab (typ) Wall base as specified true oblique Interior Elevation Type A Wall Section (Existing Wall Extension) Scale: 3/4" = 1'-0" Scale: 3/4" = 1'-0" SAMUEL M. STERLING No. 3077 ST I 1A Type B Wall Section (New Wall) E OF N W M E X G Scale: 3/8" = 1'-0" 1B RE 2 (e) Finish Floor 100'-0" Data as specified (e) Power TE O IC Power & data as specified Carpet tile as specified over (e) conc. slab T Painted gyp. bd. to match (e) EC Scale: 3/4" = 1'-0" Continuous acoustic sealant at deck (typ) 9'-6" Return Air Sound Elbow Detail B./(e) Open Web Joists 10'-4 3 5/8" 25 ga metal studs @ 16" o.c. - Secure track at top Flush wood door - See Schedules this sheet B./(e) ACT 8'-6" 4 Continuous acoustic sealant at deck (typ) 5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck (e) Open-web steel joists at 4'-0" o.c. I T Opening to match neck size of return air grille (e) Open-web steel joists at 4'-0" o.c. 5/8" Painted gyp. bd. over 3 5/8" metal studs both sides of wall - Finish to match (e) ST A 6" min. 1/2" B./(e) Roof Deck 11'-4" B./(e) Roof Deck 11'-4" 5/8" Wall Type B 2D 3 5/8" (e) Corrugated metal roof deck Extend (e) wall to deck 5/8" D (e) roof deck Wall Type A 4 7/8" 525 Buena Vista Blvd SE Albuquerque, NM 87106 ER E D A RC H S S A SAM STERLING ARCHITECTURE , llc SITE: CNM Main Campus Building A Marketing & Communications Office PROJECT INFO: APPLICABLE CODES: 924 2nd street nw suite c albuquerque, new mexico 87102 o: 505 232-2520 f 505.232.2521 www.samsterlingarchitecture.com 2009 International Building Code 2009 New Mexico Commercial Building Code 2009 New Mexico Existing Building Code 2009 New Mexico Mechanical Code 2011 New Mexico Electrical Code 2007 New Mexico Electrical Safety Code Project 1: MCO RECEPTION DESK AND LOBBY REMODEL 1A - Demolition: Remove existing built in desk in Reception A101. Remove brick wing wall at vestibule A100B. Remove doors, HM frames, sidelights walk-off mat and ACT at Vestibules A100A and A100B. Remove ceiling in A100A. Remove flooring in Lobby A100 and Reception A101, carpet in Office A101A and tile in vestibule A100A. 1B - Desk: New reception desk in Reception A101. 1C - Entry Vestibules: New storefront glazing and doors. New wall, door and HM frame in vestibule A100A for storage. New ceilings and lights. New ADA push buttons for door openers. 1D - Flooring: New carpet in Reception A101 and office A101A. New linoleum flooring and carpet in Lobby A100. New access hatch to existing floor vault. Linoleum and walk-off mats in vestibules A100A/B Central New Mexico Community College CNM Physical Plant Jennifer Davis, Project Manager Facilities Administration 525 Buena Vista Dr. SE Albuquerque, NM 87106 t: 505.224.4578 f: 505.224.4566 email: jutrata1@cnm.edu Sam Sterling Architecture, llc Sam Sterling, AIA, Principal Bron Heintz, Project Manager 924 2nd Street NW Suite C Albuquerque, New Mexico, 87102 p: 1.505.232.2520 f: 1.505.232.2521 e: sam@samsterlingarchitecture.com e: bron@samsterlingarchitecture.com 1. 2. 3. 15. ADDITIVE ALTERNATE #1 (see 7/8 A1.2) 16. 17. 18. 2A - Demolition: Remove partition wall at A101D Storage room. Remove carpet and base, and surface mounted data raceway. 1A - Demolition: Remove roll-up door, built in counter, pilasters and vertical plastic laminate panel at east wall of lobby A100. N Location Map: COA ZONE MAP K15 Not to Scale GENERAL NOTES 2C - Systems: Power and Data as required in new walls. Minor reconfiguration of existing HVAC ductwork. Minor reconfiguration of existing lights. MCO OFFICE A101D REMODEL Coal Avenue SE ARCHITECT: 2B - Construction: New partition walls at new Office A101D. Install new carpet wall base and door and HM frame with sidelight. Paint all walls. Some minor repairs to acoustic tile ceiling. 1F - Systems: Power and Data as indicated at new reception desk Alternate 1: OWNER: 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 1E - Paint: Paint gyp. board walls and exposed tube steel columns in Lobby A100. Project 2: SU-2 / O-1 19. 2A - Construction: Infill with new gypsum board wall to match existing. Install a 3/4" plywood backing on lobby side portion of wall under gypsum. Paint to match. 2B - Power/Data: Re-route existing conduit inside wall and rough in 2 new recepticals. All work to conform to all applicable codes and ordinances. All dimensions are to face of finish unless otherwise noted. General Contractor must contact Architect during demolition for assessment of existing construction. Changes in detailing may be required as a result of new findings during construction. General Contractor must field verify existing conditions and dimensions and notify the Architect of any discrepancies. All colors and materials to be reviewed and selected by the Architect from manufacturer's standards provided by the Contractor. General Contractor shall minimize noise and dust. All trash and debris shall be removed on a daily basis. General Contractor is responsible for repairing all damage as a result of construction. All doors to have accessible hardware. Provide all blocking, backing, and additional supporting structure as required for items called for in the drawings and specifications. Patch & repair all finishes affected by demolition to match existing. All new construction must be coordinated with existing site conditions. Locate and protect all existing underground utilities. General Contractor to coordinate with Owner's security system & IT consultant to allow system pre-wiring as required. Discrepancies: The General Contractor shall compare and coordinate the information shown on all drawings. Where in the opinion of the General Contractor a discrepancy exists, it shall be promptly reported to the Architect for proper clarification or adjustment. Omissions: In the event that certain features of the construction are not fully shown on the drawings, then their construction shall be the same character as the construction of similar conditions that are shown or noted on the drawings and specifications. If there is any doubt concerning the similarity of the condition, the General Contractor shall notify the Architect and request clarification. The General Contractor shall coordinate with the Owner all Owner-installed items and equipment. The General Contractor shall verify required rough opening size for all doors and windows. The General Contractor shall verify that there are no conflicts between openings in walls or slabs and structural, mechanical, electrical and/or plumbing requirements. In the event that a conflict occurs, the General Contractor shall notify the Architect immediately. Definitions: A. Provide: Furnish and install, complete with all necessary accessories, ready for intended use. Pay for all related costs. B. Approved: Acceptance of item submitted for approval. Not a limitation or release from compliance with the Contract Documents or regulatory requirements. C. Match Existing: Match existing as acceptable to the Owner and the Architect. DRAWING INDEX: Project Data A1.0 Project 1: MCO Reception Desk & Lobby Remodel - Demolition Plan - Floor Plan - Power & Special Systems Plan A1.1 Project 1: MCO Lobby Remodel Details - Interior Elevations - Reflected Ceiling Plan - Storefront Elevations A1.2 Project 1: MCO Reception Desk Details - Interior Elevations - Casework Section Detail A1.3 Project 2: MCO Office A101D Remodel - Demolition Plan - Floor Plan - Reflected Ceiling Plan & Mechanical Plan - Power & Special Systems Plan A1.4 Project 2: MCO Office A101D Remodel - Wall Section - Interior Elevation -Details - Door / Hardware Schedule WORK COVERED BY CONTRACT DOCUMENTS 1. 2. 3. 4. Permits: Unless otherwise noted, the General Contractor shall apply for, obtain, and pay for permits required to perform the work. Copies shall be submitted to the Architect. Intent: A. Construction Documents are intended to provide the basis for proper completion of the work suitable for the intended use of the Owner. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the project shall be included. The General Contractor shall furnish all labor, services, and material, etc. as required to complete the project. Accordingly, the General Contractor shall determine the subdivision of all work for the various trades, subcontractors and suppliers. B. All work and materials are not necessarily covered in both the drawings and specifications; such items, however, are a part of the work under this Contract if shown or called for by any of the Contract Documents. C. The work of any one trade, subcontractor, or supplier is not necessarily grouped into one section of the specifications or on one portion of the drawings; all persons shall check all specifications and all drawings to determine the full extent of the work for which they are responsible. Taxes: The General Contractor and all subcontractors shall pay all sales, consumer, Gross Receipts, and other similar taxes required by law. General Guaranty: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy of the project by the Owner shall constitute acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any expressed warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy all defects in the work and pay for damages to other work resulting therefrom, which shall appear within a period of one (1) year from the date of Substantial Completion of the work under the Contract. The Owner will give notice of observed defects with reasonable promptness. WORK BY OTHERS 1. 2. Data/phone/security/J-boxes: General Contractor to provide conduit and pull strings per drawings. Data & security cabling to be installed by Owner, or owners sub-contractor. General Contractor to coordinate work with Owner. General Contractor to ensure that system conduit installation is complete, and all device locations are correct prior to covering. Furniture: All mountable furniture & systems furniture shown on drawings are by Owner. HAZARDOUS MATERIALS 1. Hazardous materials report on file with Owner. SALVAGE ITEMS All door hardware Doors Door openers and closers Roll-up window in Lobby A100 (Alternate) CNM Main Campus: Building A MCO Renovations 525 Buena Vista Blvd SE Albuquerque, NM 87106 SHEET INFO G1.0 Project Data DATE: October 3, 2013 REV: GENERAL SYMBOL LEGEND: XX Structural grid xx Building section 1/A3.0 1/A3.0 Wall section 1/A2.0 Exterior elevation 1 A6.0 Detail (section) 1 A6.0 Detail (plan) Revision xx 1 Interior elevation Keyed note Elevation benchmark (e) Existing F.O.F. Face of finish O.F.C.I Owner furnished, Contractor installed O.F.I.O. A4.0 Storefront ID 100% Construction Documents Owner furnished, installed by Others STAMP Entry 100 Room ID # Door ID TE E OF N W M E X O IC 1. 2. 3. 4. PROJECT G1.0 SAMUEL M. STERLING RE No. 3077 G ST T SCOPE OF WORK: ZONING: EC BUILDING A MARKETING AND COMMUNICATIONS OFFICE (MCO) RENOVATIONS 100% CONSTRUCTION DOCUMENTS Lot: University Heights / TVI Subdivision: University Heights Elementary School UPC: 101505743810540410 I I T Main Campus Bldg. A ST A Central New Mexico Community College CNM Main Campus 525 Buena Vista Blvd SE Albuquerque, New Mexico 87106 Buena Vista Dr. SE LEGAL DESCRIPTION: ER E D ARC H
© Copyright 2024 Paperzz