PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 APPROVAL Procedure Section Process Owner Approval 1.0 Letter of Introduction 2.0 Global Competitiveness 3.0 Supply Chain Contact List 4.0 Quality Policy Statement Supply Chain Manager Springhe tti, Peter [AUTOSO L/FLMC/ LOUI] Digitally signed by Springhetti, Peter [AUTOSOL/FLMC/LOUI] DN: cn=Springhetti, Peter [AUTOSOL/FLMC/ LOUI], o=Emerson Automation Solutions, ou=Supply Chain/ Logistics, email=peter.springhetti @emerson.com, c=US Date: 2017.02.07 14:46:31 -05'00' 5.0 Quality Systems Qualifications 6.0 Process Control, Traceability, and Inspection Results 7.0 Registration, Evaluation, Authorization, and Restriction of Chemicals (REACH) 8.0 Pricing Changes and Payment Terms 9.0 Discrepant Material 10.0 Charges for Discrepant Material 11.0 Request for Deviation 12.0 Request for Engineering Change 13.0 TopWorx, Inc. Owned Tools 14.0 Delivery Requirements 15.0 Sample Submissions 16.0 Performance Reports 17.0 Calculation of Performance Scores 18.0 Nuclear Component Supplier Requirements 19.0 Revision Record REFERENCE WEBSITES Website Document ID www.topworx.com http://www.emerson.com/en-us/AboutUs/Pages/materialscompliance.aspx www.techstreet.com THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 1 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 REFERENCE DOCUMENTS Document Title Document ID 12 Month Supplier Scorecard Form Corrective Action Request (C.A.R.) Certificate of Conformance FRM-COC Engineering Change Order Form SQM-ECO First Article Inspection Approval Form Non-Disclosure Agreement FRM-NDA and/or FPP-001.3 Pre-Production Approval Process Performance Testing Results Form Purchase Order Form Sample Submission Tags FRM-SST Supplier Deviation Request Form SQM-SDR Supplier Monthly Scorecard Explanation Form Supplier Request for Engineering Change Form Tooling Information Request Form Warrant Form THIS DOCUMENT IS UNCONTROLLED IF PRINTED SQM-SREC FRM-TIR FRM-PAW Page 2 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 Definitions/Acronyms 5th 3rd Prox – payment term for 83 days APQP – Advanced Product Quality Planning C of C – Certificate of Compliance C.A.R. – Corrective Action Request CTQ – Critical to Quality FMD – Full Material Disclosures S.D.S. – Safety Data Sheet NPD – New Product Development NPI – New Product Innovations P.O. – Purchase Order PFEMA – Process – Failure Mode and Effects Analysis PPAP – Pre-Production Approval Process PPM – Parts Per Million R.M.A. – Return Material Authorization REACH – Registration, Evaluation, Authorization, and Restriction of CHemicals THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 3 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 1.0 REVISION N – February 7, 2017 LETTER OF INTRODUCTION Dear Supplier, This manual is being provided to assist you in understanding and complying with your responsibilities as a supplier/partner to TopWorx, Inc., an integral part of the Emerson Process Management Business Platform. Our company expectations, as they pertain to our supplier base, are addressed in this manual. The Supplier Performance Manual is intended to be the guiding force that will enable you, as a supplier to TopWorx, Inc., to assist TopWorx, Inc. in providing a world-class product and/or service. It is our intention that the result will be future business success and increased market share for you, TopWorx, Inc., and TopWorx, Inc. customers. Any deviations from the policies of this manual require the written consent of the TopWorx, Inc. Supply Chain Manager or their designee. Sincerely, Peter Springhetti TopWorx, Inc. Supply Chain Manager THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 4 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 2.0 REVISION N – February 7, 2017 GLOBAL COMPETITVENESS TopWorx, Inc. strives to be a world-class corporation that consistently provides our customers with quality and value, speed and excellence, and experience and expertise. In order for TopWorx, Inc. to accomplish these objectives, we must be aligned with world-class suppliers that provide the same, while maintaining global cost competitiveness. While our Supplier Performance Manual and Supplier Scorecards serve as guidance tools for producing and delivering world class products and services to TopWorx, Inc., they in no way eliminate the requirement or guarantee the existence of global cost competitiveness. TopWorx, Inc. customers demand continuous improvement of cost, quality, and delivery. Therefore, TopWorx, Inc. must also expect its own suppliers to suggest and implement continuous improvement ideas in an effort to help maintain global cost competitiveness. Sincerely, James McDill TopWorx, Inc. Director of Operations THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 5 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 3.0 REVISION N – February 7, 2017 TOPWORX, INC. SUPPLY CHAIN CONTACT LIST Global Sourcing Manager: Tim Nelson 502-873-4609 tim.nelson@emerson.com Supply Chain Manager: Peter Springhetti 502-212-8339 peter.springhetti@emerson.com Materials Management Team: Kevin Macherione – Supply Chain Sourcing Coordinator 502-873-4608 kevin.macherione@emerson.com Gary Brumley – Purchasing Coordinator 502-873-4603 gary.brumley@emerson.com Jay Tewell – Purchasing Coordinator 502-212-8311 jay.tewell@emerson.com Aaron Carroll – Senior Inventory Analyst 502-873-4621 aaron.carroll@emerson.com Lauren Caillouet – Supply Chain Assistant 502-873-4601 lauren.caillouet@emerson.com THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 6 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 4.0 REVISION N – February 7, 2017 QUALITY POLICY STATEMENT Quality Policy Statement TopWorx, Inc. will gain customer loyalty with continuous improvement and best-in-class quality, service, and responsiveness. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 7 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 5.0 REVISION N – February 7, 2017 QUALITY SYSTEMS QUALIFICATIONS 5.1 Scope of Applicability 5.1.1 All new vendors being considered for use at TopWorx, Inc. must meet at least one of the specific approval criteria as outlined below in order to be qualified as an approved supplier. 5.2 Criteria for Approval 5.2.1 Supplier has a third party quality system certification in compliance with EN 45012 or ISO/IEC 17021:2006. Copies of either one of these documents may be obtained through the following website. www.techstreet.com 5.2.2 Results from the TopWorx, Inc. Supplier Surveillance Assessment and/or audit show that a structured quality system is effectively in place. 5.2.3 There is a documented action plan, which is shared with TopWorx, Inc. that shows evidence with timing that the potential supplier is putting a structured quality system in place. 5.2.4 One of TopWorx, Inc.’s customers dictates a specific supplier to use 5.2.5 A supplier is purchased by TopWorx, Inc. or a sub-supplier is already in the purchase supply chain and must be used to sustain business. 5.2.6 A supplier is currently approved through another Emerson/Fisher business unit. 5.3 Criteria for Rejection 5.3.1 Supplier is not able to, or refuses to; provide any objective evidence for any of the documented approval criteria. 5.4 Supplier Audits: 5.4.1 Suppliers must be aware that upon written notice from TopWorx, Inc. we may request a Quality System audit to confirm that the necessary processes are in place to support our material and quality requirements. Additionally, and again with written notice, suppliers may also be subject to audits by (TopWorx, Inc.) associated third parties for similar reasons. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 8 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 6.0 REVISION N – February 7, 2017 Process Control, Traceability, and Inspection Results 6.1 TopWorx, Inc. urges all of its suppliers to implement the usage of control plans for process control. Process control plans should be maintained through the life of the specific part being supplied and made available to TopWorx, Inc., if needed. Critical to Quality (CTQ) dimensions noted on TopWorx, Inc. product drawings should always be included on the supplier process control plans. 6.2 Suppliers must insure traceability of all parts or material shipped to TopWorx, Inc. Packing slips must include at least one of the following: the supplier’s lot number, manufacturing date, job number, or invoice number. All package labels must indicate the supplier’s lot number or manufacturing date, quantity, current revision level, and the applicable TopWorx, Inc. part number. 6.3 For our certification requirements, all shipments to TopWorx, Inc. must include a Certificate of Conformance (C of C), Form FRM-COC. The C of C should be enclosed with the packing slip in a packing slip envelope attached to the outside of the package. If required, the material certifications and/or the certificates of conformance (for nuclear products) must also contain the part description and part number along with the supplier’s lot number and/or manufacturing date 6.4 TopWorx, Inc. requires that all suppliers complete and sign a Non-Disclosure Agreement. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 9 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 7.0 REVISION N – February 7, 2017 Registration, Evaluation, Authorization, and Restriction of CHemicals 7.1 (REACH) compliance data must be provided through the Emerson Compliance Web Portal – http://www.emerson.com/en-us/AboutUs/Pages/materials-compliance.aspx. Full material disclosures (FMD) are required to include, but are not limited to, all substance levels and total weight of the item(s) of purchase. This excludes protective packing, but includes any value added substances adhering to the item(s). To monitor suppliers who participate in the program, it is required that the following information be provided to this e-mail address: environmental.compliance@emerson.com. You must provide your company name, contact name, phone number, and e-mail address. 7.2 Suppliers are required to package all products being shipped to TopWorx, Inc. in such a manner that the product being shipped will arrive in a useable condition. 7.3 All material received at TopWorx, Inc. without proper identification and documentation will be considered discrepant material and will be reflected as such on the Supplier Scorecard. 7.4 TopWorx, Inc. requires all suppliers to keep evidence of all inspection results at the disposal of TopWorx, Inc. for the life of the specific part being supplied. 7.5 Safety Data Sheets (SDS) must be included with each shipment of raw materials that require this type of documentation. (e.g., chemicals, solders, glues, potting compounds, etc.) This means with each shipment no matter how frequent. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 10 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 8.0 REVISION N – February 7, 2017 Pricing Changes and Payment Terms 8.1 TopWorx, Inc. requires that all suppliers report to the Purchasing Coordinator and the Supply Chain Sourcing Coordinator, at minimum, the underlying cause(s) of a price increase or decrease from the last purchase when a change in value is realized bases upon request for quote or purchase. Any advanced notice prior to a request or purchase is encouraged. 8.2 TopWorx, Inc. requests that all suppliers ship in full quantities within standardized packaging and not exceed a weight limit of 35 pounds. Once packaging standardization is realized, we require that it is not changed unless authorized by TopWorx, Inc. 8.3 As a part of Emerson, TopWorx, Inc. adopted policy is to move all minimum payment terms to 5th 3rd prox in an effort to maintain competiveness of our global supply chain. We expect our suppliers to offer TopWorx, Inc. a competitive advantage in quality, technology, speed to market, and total value. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 11 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 9.0 REVISION N – February 7, 2017 Discrepant Material 9.1 All material found to be out of print specification or received into TopWorx, Inc. facility without proper documentation/identification is considered discrepant and may result in a Corrective Action Request (C.A.R.). 9.1.1 A Representative of the TopWorx, Inc. quality organization will contact the supplier concerning any material discrepancies and/or C.A.R.’s. Quality will provide information and samples to the supplier to aid in their investigation of these issues. 9.1.2 All C.A.R. responses from suppliers require written documentation of containment activity, root cause determination, and corrective action implemented. Failure to respond to a C.A.R. within the time frame specified on the C.A.R. form will result in lowering the supplier’s monthly performance score. 9.2 Non-Conforming Nuclear Components 9.2.1 Absolutely no known non-conforming nuclear components are allowed to be shipped to TopWorx, Inc. under any circumstances. TopWorx, Inc. suppliers that supply nuclear components shall have methods for control and disposition for items that do not meet TopWorx, Inc. part specifications. This definition includes any deviation from the current part print (e.g. material, dimensional, visual, etc.). These methods will include an evaluation process of the non-conformances and communicated to the supplier, who will then provide a submittal of notice to TopWorx, Inc. of any non-conformance’s produced with a recommendation of disposition (e.g. use as is, repair, or scrap at supplier’s site). This requirement is in addition to the “Request for Deviation” requirement. (See Section 11.0) 9.3 Notification of Non-Conformance 9.3.1 In the event that the supplier becomes aware of non-conforming or suspect nonconforming product that has already been shipped to TopWorx, Inc., that supplier MUST notify the TopWorx, Inc. Supply Chain Manager in writing within 2 days from the date the shipment was discovered. 9.4 A copy of the Corrective Action Request (C.A.R.) form can be obtained upon request to the TopWorx, Inc. Supply Chain Team. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 12 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 10.0 Charges for Discrepant Material 10.1 In the event that discrepant material is found, all costs incurred by TopWorx, Inc. due to the discrepant material are the responsibility of that supplier. 10.2 If the discrepant material is unusable to TopWorx, Inc. then the supplier must issue a Return Material Authorization (RMA) within two (2) business days of notification by a TopWorx, Inc. Quality Technician. Once the RMA is received, a debit memo will be issued against the supplier to cover the costs of the discrepant parts. Failure by the supplier to issue a RMA will still result in a debit memo against the supplier’s account for the value of the discrepant parts. If the supplier wishes to have the discrepant material returned via a RMA, then the supplier is required to provide the account number of their preferred shipping company so that associated freight costs are paid by the supplier. In the event that the supplier does not want the discrepant material, it will be scrapped out at TopWorx, Inc. 10.3 If the discrepant material is deemed usable by TopWorx, Inc. by reworking then the supplier has the choice of (1) incurring all costs for the rework labor and materials (rework labor will be charged at $35.00 per labor hour), (2) to authorize the return of the discrepant material via a RMA and replace it with good stock in such a manner that the TopWorx, Inc. production and/or shipping schedules are not jeopardized, or (3) send a supplier representative to TopWorx, Inc. facility to rework the product in such a manner that the TopWorx, Inc. production and/or shipping schedules are not jeopardized. 10.4 If the discrepant material is deemed usable by TopWorx, Inc. by sorting, then the supplier has the choice of (1) coming to the TopWorx, Inc. facility and sorting the product themselves (as long as they can keep pace with the TopWorx, Inc. product schedule), (2) authorize TopWorx, Inc. to sort the product and the supplier incur all associated costs (sorting labor will be charged at $35.00 per sorting hour), or (3) authorize the return of the discrepant material via a RMA and replace it with good stock in such a manner that the TopWorx, Inc. production and/or shipping schedules are not jeopardized. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 13 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 11.0 Request for Deviation 11.1 Discrepant/deviated REVISION N – February 7, 2017 material MUST NOT ship without receiving formal permission from TopWorx, Inc. 11.2 As a temporary corrective action for material supplied with an out of specification condition, suppliers must submit a Supplier Deviation Request Form (SQM-SDR) for the material that does not conform to the agreed upon print specifications. TopWorx, Inc. will either grant or deny each deviation request received. 11.3 A SQM-SDR must be requested by the supplier, completed, returned to the TopWorx, Inc. Supply Chain Manager or Supply Chain Sourcing Coordinator and have approval granted before the deviated material may be shipped. 11.4 If the deviation is approved, the product must be labeled with the TopWorx, Inc. deviation number that was assigned to the approved deviation request. Product that has been approved via the deviation process, but not labeled properly prior to shipment will be considered discrepant material. 11.5 If the deviation is denied, the supplier must segregate the nonconforming material and ensure that it is contained properly. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 14 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 12.0 Request for Engineering Change 12.1 Engineering Change Initiated by TopWorx, Inc. – Should there be a need for an engineering change by TopWorx, Inc., the supplier will be notified via the TopWorx, Inc. Engineering Change Order Form (SQM-ECO). The supplier may be required to attend an Advance Product Quality Planning (APQP) meeting either in person, or possibly via teleconference or videoconference, to “kick-off” the change. 12.2 Supplier Request for Engineering Change – If the supplier feels there is a need for an engineering change then the supplier must contact the TopWorx, Inc. Purchasing Department using the Supplier Request for Engineering Change Form (SQM-SREC), prior to making any changes. The TopWorx, Inc. Purchasing Department will followup by returning a copy of this document to the supplier that will either grant or deny the proposed engineering change. 12.3 A copy of the Engineering Change Order Form and the Supplier Request for Engineering Change Form can be obtained upon request to the TopWorx, Inc. Supply Chain Team. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 15 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 13.0 TopWorx, Inc. Owned Tooling 13.1 Suppliers that are using tools that are owned by TopWorx, Inc. are required to monitor and maintain the tool through routine inspections to prevent the manufacture of nonconforming product. The supplier shall inform TopWorx, Inc. at the first sign of any tooling that is inconsistent so repairs can be made. TopWorx, Inc. requires the suppliers to maintain records of all tooling inspections. Suppliers must make this information available to the TopWorx, Inc. Supply Chain Team, upon request. 13.2 A Tooling Information Request Form (FRM-TIR) is required to be completed in full after a new tool has been purchased and may be used to assess tool details prior to purchase. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 16 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 14.0 Delivery Requirements 14.1 On-Time Delivery - TopWorx, Inc. expects 100% on-time delivery from all of our suppliers. Upon receipt of a Purchase Order the supplier is required to acknowledge delivery and pricing within 24 hours. It is mandatory that suppliers who know they will ship late notify the TopWorx, Inc. Purchasing Coordinator prior to the due date. Suppliers not achieving the minimum delivery score from their Supplier Scorecard Performance Rating may be issued a Corrective Action Request (CAR). Suppliers will then be required to provide the root cause for late deliveries and a corrective action to ensure that the issue will be resolved. Any additional costs (i.e. expedite charges, premium freight from the supplier or to our customer, line downtime/overtime charges) incurred by TopWorx, Inc. as a result of late supplier shipments will be communicated to the supplier and negotiations could take place from which the supplier could be deemed liable for the extraordinary costs incurred by TopWorx, Inc. 14.2 On-Time Delivery Definition – The product(s) is received at TopWorx, Inc. on or up to 5 calendar days prior to the agreed upon due date posted on the applicable Purchase Order and is accompanied by all appropriate documentation. Suppliers will be responsible for all freight charges associated with late deliveries. 14.3 Quantity Accuracy – All suppliers are required to supply quantities according to the material release. Quantities received at TopWorx, Inc. will be treated as conforming if found to be within +/- 0% of the agreed upon quantity specified on the current purchase order. Partial shipments are discouraged and may negatively impact the supplier’s delivery performance on-quantity and on-time. 14.4 A copy of the TopWorx, Inc. Purchase Order Form and the TopWorx, Inc. Kanban Purchase Order can be obtained upon request to the TopWorx, Inc. Supply Chain Team. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 17 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 15.0 Sample Submissions 15.1 Purpose – The purpose of a sample submission is to determine if the supplier’s product conforms to all TopWorx, Inc. design specification requirements and is acceptable for production use. TopWorx, Inc. maintains the option, at our discretion, to waive submissions under certain circumstances. 15.2 Situations Requiring Sample Submission (see matrix below - Section 15.3) 15.2.1 Pre-Production Approval Process (PPAP) – A new part/product is being submitted for pre-production approval 15.2.2 Correction of a discrepancy on a previously submitted part/product 15.2.3 Part/product that was modified due to an engineering change 15.2.4 Tooling other than that used for the initial submission is being introduced. This would include refurbishment of existing tooling. 15.2.5 Manufacturing process change 15.2.6 Change source for supplier parts, materials, or services 15.2.7 NOTE: If you are unsure if or when a sample submission is required, please contact the TopWorx, Inc. Supply Chain Manager or Supply Chain Sourcing Coordinator. 15.3 Documentation Requirements by Situation: Situations Requiring Sample Submission Sample Parts Required (Minimum of 3 pieces per cavity) Full Dimensional Layout Required (Minimum of 3 pieces per cavity) Warrant Form Required (FRMPAW) 30 Piece Capability Studies for CTQ Dimensions Required Applicable Performance Testing Required (PFMEA) Material Certificate and Applicable M.S.D.S. Required Quality Control Plan 15.2.1 15.2.2 15.2.3 15.2.4 15.2.5 15.2.6 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Each sample submission request will be supported by a TopWorx, Inc. “PPAP” Purchase Order. This Purchase Order will specifically state which forms are needed when submitting samples. These forms can be found on the TopWorx, Inc. website. At a minimum, the “Part Approval Warrant Form”, “First Article Inspection Report, “Certificate of Conformance”, and the “Material Certifications” are needed with each submission. If checked off on the “PPAP” Purchase Order, a PFMEA, a Capability Study (30 pieces), or a Quality Control Plan may also be required. For all First Article Samples, the parts must be labeled with a “sample submission” tag, which is to be affixed to the outside of the container. Evaluation Process – Once TopWorx, Inc. Supply Chain Department has received the required sample submission documentation and parts, the dimensional report will be verified and performance testing, when applicable, will be verified. Using the “Part Approval Warrant” form, the TopWorx, Inc. Supply Chain Manager, or designate, will inform the supplier of the results of the sample submission. 15.4 Sample Submission THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 18 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 Approved – The part and/or product is approved for production. All dimensional, material, and performance aspects inspected have passed inspection. This approval level would permit the supplier to ship parts for production with no limitations. 15.4.2 Approved with Conditions – The part and/or product is approved for production, but under special circumstances such as limited volumes, deviated specifications, etc., until “Fully Approved” status has been granted. New samples and documentation must be submitted and approved for any non-conformance noted in the “Interim Approval” before the part and/or product can be granted full approval. 15.4.3 Rejected – New Tryout Required – The part and/or product is not acceptable for production. New samples and documentation must be submitted for any nonconformance noted. 15.4.4 Rejected – The part and/or product is rejected and TopWorx, Inc. does not require another sample submission. 15.5 All forms required for sample submissions are available on the TopWorx, Inc. Supplier website listed on page 1. 15.4.1 Fully THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 19 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 16.0 Performance Reports 16.1 Selected TopWorx, Inc. production material suppliers will receive quality and delivery performance feedback at one of the following intervals during the course of the rating year (January to December). Monthly, Quarterly, Bi-Annually, or Yearly. If there are any questions concerning the scores, please contact the Supply Chain Manager or the Supply Chain Sourcing Coordinator. 16.2 Rating Definitions 16.2.1 Quality 16.2.1.1 PPAP - number of defective parts found during the testing/qualification process and determined to be a supplier defect divided by the number of parts received for the month and multiplied by 1,000,000 (10% of total Quality Score). 16.2.1.2 Receiving Rejects – number of defective parts found during the receiving inspection process and determined to be a supplier defect divided by the number of parts received for the month and multiplied by 1,000,000 (10% of total Quality Score). 16.2.1.3 Internal Rejects - number of defective parts found during the assembly process and determined to be a supplier defect divided by the number of parts received for the month and multiplied by 1,000,000 (20% of total Quality Score). 16.2.1.4 End User Rejects - number of defective parts found by a TopWorx, Inc. customer and determined to be a supplier defect divided by the number of parts received for the month and multiplied by 1,000,000 (40% of total Quality Score). 16.2.1.5 C.A.R. Response – The number of C.A.R.’s not responded to on time as described on the C.A.R. (20% of total Quality Score). 16.2.2 Delivery 16.2.2.6 On Time Delivery – The sum of the number of pieces that were received late or were received more than five (5) calendar days earlier than the agreed upon delivery date divided by the total number of pieces received for the month multiplied by 1,000,000 (60% of total Delivery Score). 16.2.2.7 On Quantity Delivery – The sum of the number of pieces that were in excess of 10% over the agreed upon delivery quantity or were short shipped divided by the total number of pieces received for the month multiplied by 1,000,000 (40% of total Delivery Score). THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 20 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 17.0 Calculation of Performance Scores 17.1 While the basic calculation for Test, Receiving Inspection, Build, Customer, On Time Delivery, and On Quantity Delivery is Parts Per Million (PPM) and the basic calculation for response to C.A.R.’s is simply the number of late responses, the actual supplier scores will be monitored using a point system from 0 to 4. The point value can be directly correlated to the actual calculated value in each section. Each category has been weighted according to its overall importance to the total score. The weights applied to each category are posed on the form itself. The point system definitions are below. 17.2 Definitions of PPM’s 17.2.1 Total quantity charged to PPM – The total number of non-conforming parts that will be charged to the supplier’s PPM as determined by the TopWorx, Inc. Supply Chain Manager. 17.2.2 PPM – Total quantity charged to PPM divided by the quantity received for the month X 1,000,000. 17.2.2.8 17.3 A copy of the Supplier Monthly Scorecard Explanation Form and the TopWorx, Inc. 12 Month Supplier Scorecard Form can be obtained upon request to the TopWorx, Inc. Supply Chain Team. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 21 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 18.0 Nuclear Component Supplier Requirements 18.1 Any vendor supplying a nuclear component REVISION N – February 7, 2017 to TopWorx, Inc. must read and become familiar with the following: 18.1.1 Nuclear Component Definition – Any component supplied to TopWorx, Inc. that will be used in whole or as a part of a finished nuclear product. 18.1.2 Recognition of Nuclear Component Part Numbers – Any part number requested via a TopWorx, Inc. Purchase Order for use in the TopWorx, Inc. nuclear program will be preceded by a “C-“. 18.1.2.9 Example: Part Number S-S70-0625A would be specified on the TopWorx, Inc. Purchase Order as C-S-S70-0625A if it were being purchased as a nuclear component. 18.2 Nuclear Supplier Qualification Categories 18.2.1 Commercial Grade Qualification – The supplier will be required to provide Material Certifications and unique lot control numbers for all shipments. Specific requirements to the Purchase Order for these suppliers will contain, but not be limited to the following: 18.2.1.10 No substitutions for any material or specification called out on the part drawing 18.2.1.11 All products must be new (not re-worked) unless prior approval is given by the TopWorx, Inc. Supply Chain Manager or Supply Chain Sourcing Coordinator 18.2.1.12 All material shipped will be covered under a Material Certification (shipped with the parts) that contains, but is not limited to the following: 18.2.1.12.1 Corresponding TopWorx, Inc. Purchase Order number 18.2.1.12.2 Corresponding TopWorx, Inc. drawing number and current revision number, if applicable 18.2.1.12.3 Material lot control number 18.2.1.12.4 Suppliers purchase order number corresponding with the purchase of the raw material 18.2.1.12.5 Authorized signature and date 18.2.2 Standard Qualification – The supplier will be required to provide Material Certifications, Certificates of Compliance (C of C’s), unique lot control numbers, and dimensional inspection data, as requested by TopWorx, Inc. Supply Chain or Quality, for all shipments. These suppliers additionally will have a formal quality system in place and will be subject to audit of the quality system by TopWorx, Inc. or a third party auditor. This category of supplier will also be held responsible for quality record retention and non-conforming reporting requirements per the TopWorx, Inc. Supplier Performance Manual. Specific requirements to the Purchase Orders to these suppliers will contain, but not be limited to the following: 18.2.2.13 No substitutions for any material or specification called out on the part drawing 18.2.2.14 All products must be new (not re-worked) unless prior approval is given by the TopWorx, Inc. Supply Chain Manager or Supply Chain Sourcing Coordinator THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 22 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual REVISION N – February 7, 2017 All material shipped will be covered under a Material Certification (shipped with the parts) that contains, but is not limited to the following: 18.2.2.15.1 Corresponding TopWorx, Inc. Purchase Order number 18.2.2.15.2 Corresponding TopWorx, Inc. drawing number and current revision number, if applicable 18.2.2.15.3 Material lot control number 18.2.2.15.4 Suppliers purchase order number corresponding with the purchase of the raw material 18.2.2.15.5 Authorized signature and date 18.2.2.16 All material shipped will be covered under a Certificate of Compliance (shipped with the parts) that contains, but is not limited to the following: 18.2.2.16.1 Corresponding TopWorx, Inc. Purchase Order number 18.2.2.16.2 Corresponding TopWorx, Inc. drawing number and current revision number, if applicable 18.2.2.16.3 Material lot control number 18.2.2.16.4 Quantity on the order 18.2.2.16.5 Quantity being delivered 18.2.2.16.6 Brief statement stating that the product was produced in accordance to the referenced TopWorx, Inc. specifications 18.2.2.16.7 Authorized signature and date 18.2.2.17 Control of Non-Conforming Material per Section 9.0 of the TopWorx, Inc. Supplier Performance Manual. 18.2.2.18 Providing TopWorx, Inc. the right of access to the supplier’s facility where the nuclear components are being produced and providing specific hold points where said parts are subjected to in-process inspection and certain “pass” criteria is required before that part(s) are allowed to pass to the next step in the production process. 18.2.3 Nuclear Qualification – This supplier will be required to adhere to all above requirements of the Standard Qualification Supplier, but additionally will be required to prove compliance with 10 CFR Part 21 and 10 CFR 50 Appendix B 18.2.4 . Nuclear qualified suppliers are also required to incorporate appropriate QA program requirements in sub-tier procurement documents. 18.3 Retention of Quality Related Records – All quality related records associated with the manufacture of nuclear components for TopWorx, Inc., by both Standard Grade Qualified and Nuclear Qualified Suppliers, must be retained at the supplier site for a period of 15 years or provided to TopWorx, Inc. with each shipment of parts. Examples of quality related records would be, but are not limited to the following: 18.3.1 In-process data 18.3.2 Material control lot numbers 18.3.3 Associated equipment calibration records 18.2.2.15 THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 23 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual 19.0 REVISION Revision B Date REVISION N – February 7, 2017 RECORD Revision Description QSM Approval 01/14/04 Added page 21 01/14/04 Page 6 of 21, 1st paragraph, 4th line, removed “and existing”, added (as of 1/2004). 01/14/04 Page 7 of 21, 2nd paragraph, 4th line, changed “boxes” to package labels. 01/14/04 Page 7 of 21, 2nd paragraph, 5th line, added quantity and current revision level. 01/14/04 Page 7 of 21, 3rd paragraph, added this paragraph outlining general packaging requirements. 01/14/04 Page 8 of 21, 3rd paragraph, 4th line, changed “may result” to will result. 01/14/04 Page 10 of 21, 3rd paragraph, 3rd line, added requirement to send deviation requests to the Supply Chain Performance Manager. 01/14/04 Page 14 of 21, 1st paragraph, 4th line, changed “digression” to discretion. 01/14/04 Page 17 of 21, item “B” under Delivery, changed 5% to 10% C 03/15/04 Appendix 1, revised weighting of Quality and Delivery categories 03/15/04 Page 13 of 21, 2nd paragraph, added “Suppliers will be responsible for all freight charges associated with late deliveries.” 03/15/04 Page 13 of 21, 3rd paragraph, added “partial shipments are not acceptable and will be counted as Off Quantity”. Appendix J, Scorecard layout and verbiage revised as follows: “Receiving Inspection – 20% of Quality Score is now Receiving; Rejects – 10% of Quality Score; Build – 20% of Quality Score is now Internal Rejects – 20% of Quality Score; Test – 20% of Quality Score is now PPAP – 10% of Quality Score; Customer – 03/15/04 20% of Quality Score is now End User Rejects – 40% of Quality Score; Response to SCAR’s – 20% of Quality Score is now CAR Response – 20% of Quality Score; On Time Delivery was weighted at 70% now it is weighted at 60%; Quantity Reliability – 30% of Delivery Score is now On Quantity Delivery – 40% of Delivery Score. THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 24 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual Revision Date REVISION N – February 7, 2017 Revision Description rd QSM Approval th 03/15/04 Page 13 of 21, 3 paragraph, 5 line, changed to say 50 pieces or less. D 05/11/06 Page 7 of 21, added item number 4 and 5 under Criteria for Approval. E 03/04/09 Added website cover page 03/04/09 Page 3, changed e-mail address 03/04/09 Page 5, updated Quality Policy Statement 03/04/09 Page 7 of 21, paragraph 2, line 2, changed packing slip “should” to “must”. 03/04/09 Page 8 of 21, added NCR for nuclear components 03/04/09 Page 20-22, added Nuclear Components Requirement Section F 07/12/10 Page 4, updated contact list 07/12/10 Page 6, updated Quality Policy Page 22, added inspection data as requested by Supply Chain or Quality. G 01/12/11 H 01/16/12 Page 4, changed TopWorx, Inc. contact list 01/16/12 I Page 17, clarified frequency of when Supplier Performance Data is provided to suppliers 05/25/12 Page 1, changed link to website 05/25/12 Page 4, changed TopWorx, Inc. contact list 05/25/12 Page 5, removed “Appendices Section” 05/25/12 Page 7, amended Scope of Applicability/Supplier Approval Process THIS DOCUMENT IS UNCONTROLLED IF PRINTED Page 25 of 26 PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE – Supplier Performance Manual Revision Date REVISION N – February 7, 2017 Revision Description 05/25/12 Page 8, added maximum package weight, D of C requirement, and REACH information 05/25/12 Page 9, added information on supplier price changes and TopWorx, Inc. payment terms QSM Approval 05/25/12 Page 10, revised RMS process 05/25/12 Page 14, changed days late/early, over ship allowance 05/25/12 Page 15, added comment on Purchase Order Acknowledgments 05/25/12 Page 16, added comment on TopWorx, Inc. First Article Approval Form Rewrote SPM to standard TopWorx, Inc. procedure format. 10/12/12 Added definitions for supplier ratings. Revised Sample Submission matrix. J 10/12/12 Page 18, Modify Section 15.0 Sample Submission Process 10/12/12 Page 6, updated the Supply Chain contact list K 4/7/15 L 12/7/15 M 2/9/16 N 2/7/17 Page 8, added section 5.4, Supplier Audits. Revised Supply Chain list contact information Page 2, change Declaration of Conformance to Certificate of Conformance. Page 3, change Declaration of Conformance to Certificate of Conformance and change MSDS to SDS. Page 6, change contact list. Page 9, change reference in 6.3 to Certificate of Conformance. Page 18, change Declaration of Conformance to Certificate of Conformance. Page 1, change TopWorx website address and update website for REACH information. Page 2, remove Kanban Purchase Order from list. Page 6, added Sean Lawler as new Supply Chain Assistant. Page 10, section 7.1, modified REACH compliance web address; added section 7.5 regarding Safety Data Sheets. Page 17, eliminate section 14.4. Page 18, change section 15.3. Page 21, 22, eliminated section 17.3. Page 24, added 10CFR50 Appendix B to 18.2.3. Also added 18.2.4. Page 6, updated Section 3.0, TopWorx Supply Chain Contact List THIS DOCUMENT IS UNCONTROLLED IF PRINTED Mark Brozak Digitally signed by Mark Brozak DN: cn=Mark Brozak, o=TopWorxEmerson Process Mgmt, ou=Quality Mgr, email=mark.brozak@emerson.com, c=US Date: 2017.02.08 07:48:25 -05'00' Page 26 of 26
© Copyright 2025 Paperzz