ft2long_description.pdf

FAST TRACK II
System Description
August 2002
MultiModal Applied Systems, Inc.
125 Village Blvd, Suite 270
Princeton, NJ 08540
609-419-9800
www.multimodalinc.com
MultiModal FastTrack II System Description
MultiModal has teamed up with Rail Sciences of Atlanta, Georgia to develop the next generation of railroad line
capacity planning tools, FastTrack™ II. FastTrack™ II represents a major upgrade to our original FastTrack™
application and is a companion system to MultiModal’s MultiRail, the industry standard for rail service design and
operations planning.
FastTrack™ II is a PC based train dispatching and meet-pass model capable of producing a feasible train
dispatching plan for a user-selected corridor, given a set of proposed train schedules and a corridor’s track
configuration. FastTrack™ II uses Rail Sciences RDCAM© technology, a product based on 17 years of experience
in developing real-time meet/pass planning systems and train dispatching software.
Applied as a standalone product, or in conjunction with MultiRail, FastTrack™ II can be used to:
•
•
•
•
•
•
•
•
Examine the feasibility of a set of proposed train schedules
Test impact of proposed changes in operating policies on train service.
Measure both theoretical and practical line capacity.
Support line rationalization studies
Plan siding placement and gauge the impact of siding extensions and removal.
Measure the impact of proposed train service modifications that include:
• Increased train volumes
• Consist variations in locomotive power and car counts.
Measure impact of MOW windows allowing user to identify optimal time to schedule MOW track time
with minimum impact on train service.
Allow the user to measure impact of proposed changes to signal systems or other factors affecting train
movement authorities.
Time Distance Diagram Showing Track Configuration
© MultiModal Applied Systems, Inc.
Page 2
FastTrack™ II is based on the field tested and proven RD-CAM© technology from Rail Sciences. FastTrack™ II has
been licensed by Norfolk Southern (USA), CVRD (Brazil), ALL (Brazil), FCA (Brazil), and Spoornet (South
Africa) and the technology has been used for studies at MRS (Brazil), Norfolk Southern, Spoornet, CSX, Conrail,
Union Pacific, FSA (Brazil), and TFM (Mexico).
FastTrack Applications and Features
The most common applications for FastTrack™ II include schedule feasibility testing and line capacity analysis.
FastTrack™ II is fully integrated with MultiRail®, which makes it very easy to download your train schedules
directly to FastTrack™ II. With FastTrack™ II you dispatch these “raw” schedules developed by service design in
MultiRail, and you can get an idea if the schedules are achievable if run at the designed times. FastTrack™ II can be
used to test various scenarios and evaluate the impact of changes in the trains operated or the physical attributes of
the line.
MultiRail® Train Manager Screen
FastTrack™ Train Record Screen
© MultiModal Applied Systems, Inc.
Page 3
Some of the key features of FastTrack™ II are:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Operates over both single track and multiple track networks, with support for divergent routes.
Considers slow orders by location, date and time of day.
Handles over 20 days of scheduling
Works with many existing Train Performance Calculators (TPC) including MultiRail® TPC.
Metric or English with multiple display options
Allows programmable objective functions that are selectable by individual train symbol and location.
Considers both planned and unplanned track outages and delays due to such factors as M/W work, derailments,
stalls, etc.
Extensive ability to modify train consists enroute including changes to the motive power, consist, priority and
the train’s priority and operating characteristics.
Unopposed run time predictions based on both train performance, track profile and all applicable operating
restrictions that are appropriate for the train’s position and classification.
Either import from our new MultiRail® Track Manager or use FastTrack™ toolkit that allows construction of all
train and track databases that are required for FastTrack™ II use.
Extensive standard report capability.
Flexible ASCII and standard database formats permit easy interchange of data with corporate databases and
input of results to other systems, such as MultiRail, for further analysis or report production.
Wide variety of methods for restricting both routes and runtimes by both train class and train symbol.
Flexible methods for assigning enroute work over multiple tracks both online and offline that affects both the
train’s runtime, consist and operating characteristics.
Dependent train logic permits variety of complex operating procedures including bi-directional trains, helper
movements, and other dependent scheduled movements.
System considers all appropriate speed limit restrictions including limits by train class, milepost location, time
of day, turnout, and individual train symbol.
System can model wide variety of both signaled and non-signaled territories with a near limitless combination
of user-defined rail networks.
Probabilistic based calculation of delays due to work, slow orders and scheduled train departure from origin
locations.
Automatic generation of run times based on train class, consist, train position and acceleration/deceleration
delays due to speed limit changes, enroute work and meet/pass delays.
Another key function in FastTrack™ II is its animation, which allows both technical staff and line management the
ability to quickly analyze what if scenarios. The animations can be used to show several days of train movements
and complete graphical and table summaries are available for review.
© MultiModal Applied Systems, Inc.
Page 4
FastTrack™ II Time Distance Diagram
FastTrack™ II Animation Screen
© MultiModal Applied Systems, Inc.
Page 5
Benefits of MultiRail®- FastTrack™ II Integration
Recently we have developed several upgrade releases of FastTrack™ II that are integrated and provide a seamless
interchange of data with MultiRail. The combined capabilities offered by MultiRail and FastTrack™ gives our
users the following direct benefits:
•
An ability to use MultiRail as a front end for entering, maintaining, changing and validating trains schedules,
including pre-analysis timetables and time-distance diagrams.
•
The new MultiRail Track Manager for developing detailed track configurations for use in FastTrack™ II.
•
The unique ability to import and export data directly to the FastTrack™ II meet-pass planning tool without rekeying data
•
The advantage of state-of-the-art program construction which offers unparalleled processing speed and
reporting, which offers our clients the benefit of quick project turnaround
Project management and assistance from skilled professionals with years of combined analytical and railroad
operations planning experience
•
MultiRail® Track Manager Screen
For more information on FastTrack™ II, please contact Kevin Foy at kevin@multimodalinc.com or at 609-4199800.
© MultiModal Applied Systems, Inc.
Page 6