BEFORE THE POSTAL 20268-0001 WASHINGTON, DC POSTAL RATE AND FEE CHANGES prcfp/E!? RATE COMMISSION Docket I I No. R2000-1 REPLY BRIEF OF THE CONTINUITY SHIPPERS ASSOCIATION The Continuity the rate for A. the actual for costs, Tr. costs Service its reply brief on ("BPRS"). due unit Service agrees BPRS parcels, overstated costs. that the downward reasons, double BPRS parcels postage the to reflect Postal for G. But's weighing brought to determine their Tr. these testimony Service this fact. one cent per 1 the are weighed included while not incurred to adjust its window 23/10644. of window piece. Tr. costs. window are Tr. estimate acceptance postage, In addition, costs fails to the already 23/10644. acceptance and rating parcels therefore acceptance window BPRS window A parcels and are Service's by more than By using counts because window Postal Lawrence as a proxy Standard due unit rebutted Reduction: and rating the postage costs submits a BPRS parcel. Service While for has not A parcels Postal weighing true for Standard the require in Return - 1.2 Cent 23/10644. not Parcel Service Collection costs Bulk Association THE EVIDENCE SUPPORTS BUC'S REDUCTION IN BPRS COSTS The Postal on the Shippers would same is and rated in the the Postal for all acceptance For these acceptance 23/10644. costs is Mail direct the testimony, proxy Mr. Special reflect the Special Standard the Postal fact that wrong. in fixed as the asserts because Mr. costs activities are such "fixed" USPS Initial Postal factor smaller pools are at VIII-8. analysis clearly pools are as cube-related performed in the not adjust to than initial would brief, be cube-related The Postal showed that proportional should downward 1n its But's just In his and lighter an adjustment cost Brief Reduction: Service 23/10646-10647. that the the Cent CRA adjustment BPRS parcels Tr. - 6.34 that fixed parcels. weight-related. simply But proved Standard Service inappropriate the - CRA Adjustment Processing or Service the activities and weight-related cost pools: The [fixed] cost pools appear to fall into different categories: those in which costs are expected those in which they are not. Activities in the "expected" cost pools, SPBS or the pouching pools, should be affected by weight to factors the same degree that these "proportional Since witness cost pools". confirmed that differences in the cube and weight lead to its modeled costs being about 70 percent modeled cost of Standard B (Tr. Special (Eggleston)), the "expected" cost pools should have a fixed CPA adjustment that is 70 percent Special Standard B fixed CRA adjustment. two and like the cube and affect Eggleston of BPRS of the 13/5204 similarly of the in the fixed adjustment Costs for other cost pools cost registry are pools, like the BCS, FSM, or When asked about these apparent anomalies, "unexpected“. witness Eggleston responded, "It is my understanding that occasionally costs show up in cost pools where they are unexpected. It is my further understanding that the reason for this is the following. The IOCS handling tallies record the mail actually being handled by the employees recorded as working a given mail processing operation (cost rather than the mail expected to be handled in a pool), given operation." Tr.13/5128 (Eggleston) Thus, if an employee was clocked into the BCS cost Standard B tally, that received a Special and pool, Special Standard mail. employee was most likely handling 2 is And, if he was actually handling Special Standard B mail, it is much more likely that he was actually handling it in a way that witness Eggleston modeled rather than putting it Tr. 23/10646. through a bar code sorter. Mail Processing The Postal Service inter-BMC least on the mailers. This one of the 35-36. But's Service's reasons only model adjustment of the brief are adjustment should Transportation But's analysis transportation BPRS recipients made despite the not a national mailer. that brief that this at to the Postal Tr. 23/10647. and because incorporates at USPS-T-26 information. initial are are fact adjustment this Reduction: 21 BPRS parcels is But modified it remains information, - 2.9 Cent the located in For the But's But's - Intra-BMC above half areas will that in the use zones in CSA's unrebutted results as well. 3 in - 0.9 on this a reduction Cent in zone half Postal above initial point, Commission. Inter-BMC v. fact rarely described remains by the the assumed of BPRS volume that In his Reduction: Service's to reflect reasons argument be accepted discussed Postal BPRS parcels and more than Tr.23/10648. and because all - Zone Distribution BPRS recipients zone 5. in our record Mr. survey of every that to incorporate of inter-BMC Service's is - 0.3 Cent be accepted. testimony, distribution 20 out makes a reasonable on the should Inter-BMC assumption described Transportation direct that BPRS mailers model v. estimate analysis cost For the the estimates parcels national - Intra-BMC Reduction: his BPRS COSTS ARE 99.2 B. The FY 1999 update except for in initial our Standard mail had an insignificant processing. CSA Initial the FY 1999 mail brief, B (on which The overall used. BPRS mail impact Standard something receive the the the processing is data based) FY 1999 is As discussed at 3-4. for Special should not be shown below. increase decrease increase increase increase BPRS attributable class that cost differently than Brief should they of 99.2 This name does not have the They remain Service handle would transform and use the cents. like to treat should change for not what same coverage. the Tr. handle is. one pound, these parcels BPRS labels have The Postal 23/10650. purpose into transportation. BPRS parcels be allowed. it under A parcels, on them. A parcels themselves same ground employees Standard A" written Standard at 13. operationally returned. Postal "Standard nevertheless, by another are same low priority, same way that mail do not when they to ensure Service, Initial A parcels else In fact, legs a unit Brief on BPRS costs, THE COST COVERAGE SHOULD BE THE SAME AS STANDARD A REGULAR C. in 0.0 0.9 1.7 1.0 0.1 0.3 supports impact processing of using Collection Mail Processing Transportation Delivery Postage Due TOTAL The evidence CENT USING FY 1999 AS THE BASE YEAR significantly of pricing. CSA Calling something The outbound and return D. CONCLUSION For the Continuity piece $0.992 reasons Shippers for the in stated herein, Association BPRS rate requests (without FY 1992 costs of 132.9 percent Dated: September 21, (or its coverage $0.328 towards 2000 initial brief, a recommendation This contingency). and a cost Regular and in per of to Standard institutional Respectfully of $1.32 consists of equal the A costs). Submitted, C~ && Aaron Horowitzu 200 Corporate Woods Parkway Vernon Hills, IL 60061-3167 (847) 913-3360 Attorney Shippers CERTIFICATE on all section Dated: for the Continuity Association OF SERVICE I hereby certify that I have this day served the foregoing participants of record in this proceeding in accordance 12 of the Rules of Practice. September 21, 2000 5 brief with
© Copyright 2025 Paperzz