Development of Power Sector during 12th Plan in Manipur By Electricity Department Govt. of Manipur 1 Abstract of 12th Plan(Power Sector) Sl. No. Sector/Scheme Cost in crore Remarks 1. Generation 267.00 For equity contribution of GOM for Loktak Downstream & Tipiamukh projects. 100.00 crs. viability gap funding for Loktak Downstream. 2. Transmission & Distribution I. 132 KV System II. 33 KV System III. 11 KV System i/c metering 3. Metering with Pre-payment meters, Replacement with Static meters 99.00 4. Rural Electrification under State Plan 36.70 5. Misc. 93.10 Total 1401.95 crs. I. 491.00 II. 360.05 III. 55.10 For installation of new S/Ss, modernization, augmentation, strengthening etc. Metering with Pre-payment meters in greater Imphal & all district head qtrs. In the remaining areas the existing electromechanical meters with static meters. 2 Allocated Share of power for Manipur from the Central Sector Generating Stations Name of Project Installed Capacity (MW) Allocated Share of Manipur (%) (MW) Kopili 200 7.409 14.82 Kopili-II 25 7.249 1.81 Khendong 50 6.589 3.29 RHEP 405 8.392 33.99 DHEP 75 7.918 5.94 AGBPP 291 8.149 23.71 AGTPP 84 8.168 6.86 Loktak HEP 90 30.139 27.12 Baramura GTP 42 25 10.50 Total 128.04 3 Demand and Supply Gap During Recent Years Year Peak Power Peak Demand Met (MW) Demand Required (MW) Shortfall in MW Remarks Gap has been increasing substantially. The system is managed by resorting to regular load shedding program. 2005-06 117 115 2 2006-07 134 110 24 2007-08 145 110 35 2008-09 157 100 57 2009-10 170 110 60 2010-11 180 115 65 2011-12 (Present scenario) i) Peak ii) Off peak i) 193 ii) 110 i) 100* ii) 35 i) 93 ii) 75 * (i) Peak hour scenario is for 2 hrs. only. 4 Major Issues & Challenges ahead (during 12th Plan) High AT & C losses and its reduction. Increasing Gap in Demand-Supply – its management. Very Old Transmission & Distribution Networks. Acute Shortage of manpower ( 1967 nos. of staff in all categories). Inadequate inter state 132 KV lines. No meaningful State owned Generation. 5 Existing Transmission & Distribution System at the end of 11th Plan and AT & C losses Sl. No. Particular/Category 1. 132 / 33 KV S/Ss, 132 KV line 2. 33 / 11KV S/Ss, 33KV line 3. Distribution S/Ss of different capacities, 11KV line No. of SubStations Total Capacity in MVA Total length in Km 10 311.95 458.71 52 (i/c one GIS S/S) 320.65 1037.269 3218 357.65 5329.35 Loss Rate 4. AT & C Losses 60% Remarks Abnormally high loss rate 6 Achievement target at the end of 12th Plan • Reduction of existing AT & C losses to 30%. • Up-gradation of existing Transmission lines to :i) 5863 Km of 11 KV line. ii) 1483.269 Km of 33 KV line. iii) 727.71 Km of 132 KV line. iv) 166 Km of 400 KV D/C line (to be charged at 132 KV) . • Up- gradation of Transformation capacity to :i) 493 MVA ( 11 KV ) ii) 463.65 MVA (33/11 KV) iii) 461.45 MVA (132/33 KV) iv) 100 MVA (400 KV) ( to be charged at 132 KV) • Capacity Addition of 172 MW through central allocation and shared generation in the state. 7 Schemes in hand to be carried over in 12th Plan Sl. No. Schemes Status/ Details Cost in crs. Remarks 1. R-APDRP in 13 towns. i) ii) i) ii) i) Work order issued for ring fencing on 23.12.11. To be completed within 3 yrs from the date of sanction ( 3/11). ii) DPR submitted. 2. Installation of Prepayment meters in Imphal area. 50% completed 29.00 To be completed by 12/2012. 3. Installation of 132/33 KV S/Ss at Hundung, Chandel 50% completed 64.00 To be completed by 3/2013. 4. Ongoing APDRP 85% completed 159.00 To be completed by 9/2012. 5. Modernization of 132 KV S/S 70% completed 35.41 To be completed by March 2013. Part A Part- B 31.00 480.00 8 Contd…/- Schemes in hand to be carried over in 12th Plan (contd) Sl. No. Schemes Status/ Details Cost in crs. Remarks 6. Modernization of 132/33 KV S/Ss at Ningthoukhong & Yaingangpokpi - 39.00 Sanctioned by DoNER . Order to be issued by 3/2012. 7. Augmentation of 132/33 KV S/Ss at Ningthoukhong, Yaingangpokpi - 11.00 To be completed by March 2013. 9 Schemes to reduce AT & C Losses Sl. No. Schemes Details/ Status Cost in crore Remarks 1. R- APDRP 2. Installation of Prepayment meters in Greater Imphal and all District Head Qtrs. 50.00 52,000 nos. to be installed. 3. Replacement of electromechanical energy meters with static energy meters in remaining areas of the State. - 40.47 99,000 nos. to be replaced. 4. Metering of all Feeders at 11 KV, 33 KV & 132 KV levels. - 15.00 5. Various system impvt. Schemes at 11 Kv, 33KV and 132 KV levels - 374.00 Details already shown. 10 Targeted Generation Capacity Addition Sl. No. Projects Expected Share of the State in MW Remarks 1. Pallatana 42 1st unit to be commissioned by 03/2012, whole units by 12/2012. 2. Bongaigaon 40 1st Unit to be commissioned by 06/2012, whole units by 2013. 3. Lower Subansiri 43 To be commissioned by mid 2013. 4. Kameng 14 To be commissioned by mid 2014. 5. Loktak Downstream 33 1st unit to be commissioned by 03/2017. Total 172 MW At the end of 12th Plan 11 Projected Demand- Supply Regime at the end of 12th Plan Sl. No. Year Projected Demand in MW Anticipated power Remarks available for Supply in MW 1. 2012-13 200 193 1st unit of Bongaigaon(13) and & whole units of Pallatana (42) 2. 2013-14 214 263 2nd and 3rd units of Bongaigaon (27)& Subansiri(43). 3. 2014-15 230 277 Kameng HE Project(14 MW) 4. 2015-16 250 277 5. 2016-17 270 310 1st unit of LDS(33 MW) 12 Comparative infrastructure scenarios at the end of 11th and 12th Plan Sl. No. Particulars/ Category 11th Plan 12th Plan Target /Addition in 12th Plan 1. 11 KV System i) No. of S/Ss ii) Capacity iii) Line i) 3218 ii) 357.33 MVA iii) 5329.35 Km i) 4183 ii) 493 MVA iii) 6928.155 Km i) 965 ii)135.67 MVA iii)1598.805 Km 2. 33 KV System i) No. of S/Ss ii) Capacity iii) Line i) 52 ii) 305.6 MVA iii) 1037.269 Km i) 70 ii) 463.65 MVA iii) 1483.269 Km i) 18 ii) 158.05 MVA iii) 446 Km 3. 132 KV System i) No. of S/Ss ii) Capacity iii) Line i) 10 ii) 311.95 MVA iii) 458.71 Km i) 12 ii) 461.45 MVA iii) 727.71 Km i) 2 ii) 149.50 MVA iii) 269 Km 4. 400 KV System i) No. of S/Ss ii) Capacity iii) Line( D/C ) to be charged at 132 KV i) 1 ii) 100 MVA iii) 166 Km i) 1 ii) 100 MVA iii) 166 Km 5. Pre-payment meters 15,000 52,000 37,000 6. AT & C Losses 60% 30% 30% - 13 THANK YOU 14
© Copyright 2025 Paperzz